SOURCES SOUGHT
F -- Storm Water Pollution Plan (SWPP) - Sources Sought Market Survey
- Notice Date
- 12/10/2015
- Notice Type
- Sources Sought
- NAICS
- 541620
— Environmental Consulting Services
- Contracting Office
- Department of Agriculture, Forest Service, R-5 Southern CA Acquisition Service Area, 701 N. Santa Anita Ave., Arcadia, California, 91006, United States
- ZIP Code
- 91006
- Solicitation Number
- 774121
- Archive Date
- 12/31/2015
- Point of Contact
- Erwin Fernandez, Phone: 909-382-2654
- E-Mail Address
-
erwinfernandez@fs.fed.us
(erwinfernandez@fs.fed.us)
- Small Business Set-Aside
- N/A
- Description
- Sources Sought Market Survey to be Completed by Interested Bidders Seeking for a contractor that will prepare a Storm Water Pollution Plan (SWPPP) for the Baldy Mesa Staging and Development project on the Front Country Ranger District of the San Bernardino National Forest. The contractor besides being a Qualified SWPPP Developer (QSD) will provide a Qualified SWPPP Practitioner (QSP) to insure the SWPPP is implemented as designed. This SWPPP is written for a project with coverage under the State Water Resources Control Board Order No. 2009-0009-DWQ, General Permit No. CAS000002 and Amendment Order No. 2010-0014-DWQ as a Risk Level 1 project. The selected Contractor will ensure that the SWPPP is developed and amended or revised by a Qualified SWPPP Developer (QSD) to insure that: 1. All pollutants and their sources, including sources of sediment associated with construction are controlled. 2. All non-storm water discharges are identified and either eliminated, controlled, or treated. 3. Best Management Practices (BMPs) are effective and result in the reduction or elimination of pollutants in storm water discharges and authorized non-storm water discharges from the project site during construction. 4. Post-construction stabilization BMPs installed to reduce or eliminate pollutants are effective and properly maintained. Qualified SWPPP Practitioner The selected Contractor will ensure that all BMPs required by this General Permit are implemented by a Qualified SWPPP Practitioner (QSP). The QSP is responsible for non-storm water and storm water visual observations, sampling and analysis (as required), and for ensuring full compliance with the permit and implementation of all elements of the SWPPP. Please see attached market research survey.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/91T5/774121/listing.html)
- Record
- SN03966776-W 20151212/151210234803-bef23853dcb7757b468666346f9212bc (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |