FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 14, 2015 FBO #5073
SOURCES SOUGHT

Y -- 1-D Ash Basin Closure

Notice Date
10/12/2015
 
Notice Type
Sources Sought
 
NAICS
238990 — All Other Specialty Trade Contractors
 
Contracting Office
Department of Energy, Savannah River Nuclear Solutions, LLC, Savannah River Nuclear Solutions, LLC, Savannah River Site, Bldg 730-2B, Aiken, South Carolina, 29808, United States
 
ZIP Code
29808
 
Solicitation Number
250831NA
 
Archive Date
11/11/2015
 
Point of Contact
Nicanor Aguilar,
 
E-Mail Address
Nicanor.Aguilar@srs.gov
(Nicanor.Aguilar@srs.gov)
 
Small Business Set-Aside
N/A
 
Description
Savannah River Nuclear Solutions (SRNS), managing contractor for the Savannah River Site (SRS) in Aiken, SC, for the Department of Energy (DOE) is seeking resources capable of performing remedial closure of two inlet basins, an ash basin and a coal pile runoff basin. The inlet basins, ash basin and coal pile runoff basin are unlined, earthen containment structures originally built on grade (ground elevation). The area impacted by the presence of ash, coal fines and/or contaminated soil covers is approximately 55 acres. Wet ash in an ash basin will be consolidated by moving ash from the western portion of the basin to the eastern portion of the basin. Wet ash and contaminated soil from the inlet basins; coal fines and contaminated soil from a coal pile runoff basin; and additional ash from an area east of an ash landfill will also be placed into the eastern end of the ash basin as well as ash from some of the roads around the ash basin, (total approximately 330,000 cubic yards). Approximately 60% of the ash basin is vegetative, to include trees, scrub and grasses, which will be removed and appropriately dispositioned as part of the project, (approximately 18 acres). A new berm will be constructed within the ash basin to accommodate the size reduction of the basin. A final cover system (approximately 20 acres) will be constructed over the consolidated materials within the eastern end of the ash basin consisting of a 6 inch compacted soil base layer, a soil foundation layer, a geosynthetic clay liner (GCL), geosynthetic drainage layer (GDL) and a 20 inch compacted soil cover layer, 4 inches of top soil and sod. The inlet basins and the western end of the ash basin will be re-graded for proper drainage. Portions of the existing west and south ash basin berms and the east inlet basin berm will be lowered. Coal fines and contaminated soil in the coal pile runoff basin will be removed and placed into the eastern end of the ash basin. The basin berms will be regraded, clean fill placed in the basin bottom, and all disturbed areas grassed. The coal pile runoff basin will be converted into a storm water retention basin. Additional work associated with the coal pile runoff basin includes modifications of an existing storm water system to reroute flow back into the coal pile runoff basin. The bulk quantities stated above are estimated and being supplied for a rough magnitude of the work required for this solicitation. This scope of work shall be under Davis-Bacon Act and awardee shall be signatory to SRNS Site Alliance Labor Agreement. Solicitation shall be issued for open competition, including large businesses.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/1503a2cdfe5700cddc86ad6210fa0f66)
 
Place of Performance
Address: Savannah River Site, Aiken, South Carolina, 29808, United States
Zip Code: 29808
 
Record
SN03919812-W 20151014/151012233239-1503a2cdfe5700cddc86ad6210fa0f66 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.