Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 03, 2015 FBO #5062
MODIFICATION

Y -- HI STP SR30(1) Lahaina Bypass 1B-2 (DESIGN-BUILD) - Solicitation 1

Notice Date
10/1/2015
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6815R00009
 
Archive Date
1/31/2016
 
Point of Contact
Joseph L Wilson, Phone: 7209633500, Jeremiah B. Rogers, Phone: 720963500
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Request for Qualifications THIS TWO-PHASE DESIGN-BUILD PROJECT IS ADVERTISED ON AN UNRESTRICTED (FULL AND OPEN) BASIS. A GOVERNMENT-LED SITE VISIT IS SCHEDULED TO BE HELD ON OCTOBER 21, 2015. DETAILS REGARDING THIS NON-MANDATORY SITE VISIT WILL BE INCLUDING IN THE RFQ. Project Location: The Lahaina Bypass 1B-2 project is located on the island of Maui in Hawaii. The project is approximately 4 miles southeast of the town of Lahaina. Project Description: This project is the second phase of work on the Lahaina Bypass. The previous phase was completed by the Hawaii Department of Transportation. This phase starts at the southeastern termini of the previous bypass phase (Lahaina Bypass 1B-1) and continues approximately 2.7 miles to the southeast to the proposed southern terminus back onto The Honoapilani Highway (State Route 30). The preliminary design is approximately 30-percent complete and assumes the following major work items and approximate quantities: Line Item Unit Estimated Quantity Roadway Excavation: 70,000 CUYD Roadway Embankment: 500,000 CUYD Pavement: 163,000 SQYD Major Crossings (drainage and secondary roadways greater than 20-foot span): 4 EACH Minor Crossings (drainage less than 20-foot span) 10 EACH A two-phase design-build selection process is the solicitation approach. The work will take a place in an environmentally sensitive area and will require context sensitive design and construction approaches. Environmental clearance and right-of-way acquisitions are expected to be complete prior to the award of a design-build contract. D-B Estimate Range: $30-40.0 million
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6815R00009/listing.html)
 
Place of Performance
Address: Maui County, Lahaina, Hawaii, 96761, United States
Zip Code: 96761
 
Record
SN03911401-W 20151003/151001234316-1b121c653449d852af21b59ac951c6e3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.