Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 23, 2015 FBO #5021
MODIFICATION

S -- Federal Aggregated Solar Procurement Project (Photovoltaic installatioins) - Amendment 13

Notice Date
8/21/2015
 
Notice Type
Modification/Amendment
 
NAICS
221114 — Solar Electric Power Generation
 
Contracting Office
General Services Administration, Public Buildings Service (PBS), Real Property Programs Division, Contracts Section (9PMFC), 450 Golden Gate Avenue, 4 East, San Francisco, California, 94102
 
ZIP Code
94102
 
Solicitation Number
GS-09P-15-KS-C-7000
 
Point of Contact
Michele Agee Long, Phone: 415-522-3050, Mark S Levi, Phone: 304.728-2324
 
E-Mail Address
Michele.Long@gsa.gov, mark.levi@gsa.gov
(Michele.Long@gsa.gov, mark.levi@gsa.gov)
 
Small Business Set-Aside
N/A
 
Description
Forest Service Site Statement of Work, as amended. Changes are in yellow highlight. Sections K,L,M document as amended. Changes are in yellow highlight. Section C as amended. Changes are in yellow highlight. Sections A,B,D-H document as amended. Changes are in yellow highlight. C.5.2 System Minimum and Maximum Capacity Requirements, as amended. Changes are in yellow highlight Price Schedule as amended. Changes are in yellow highlight. Amendment 13 Standard Form 30 Amendment 13 is posted, making the following changes: 1. L.1.5 is changed to extend the due date for receipt of offers to August 31, 2015 at 4:00 PM Pacific time, and reopens the period for receipt of questions through August 24, 2015. 2. The section C.5.2 table and the Section B.4 “Summary of Maximum and Minimum Values” have been changed to make changes to minimum and maximum kWh production requirements for the Peckham (San Jose), Shea (Santa Rosa), Carson City, Ryan (NARA, San Bruno), and C. Clifton Young (Reno) sites. 3. Forest Service Site Statement of Work is revised to add clarifying language to Section 6. No pricing options are required; this section states various requirements to be priced into the kWh price as applicable. 4. Section L.4.1.2.2 is revised to make certain clarifications about technical proposal requirements. 5. Section L.4.1.2.2, requirement to submit “System Type with Mode of Operation” is deleted. 6. The Price Schedule and L.4.3.2 are revised to require a breakout by building of prices to remove and restore rooftop PV systems to accommodate roof replacement projects for the USGS Menlo Park campus. 7. B.3.2(2) is revised to reflect applicability to tax law. 8. B.3.4 is revised to indicate that any project incentives from NVEnergy for the Carson City and C.Clifton Young (Reno) systems will go to the Government. This is to eliminate pricing undertainty, as NVEnergy rules exclude the federal government from program eligibility. 9. C.5.3 is revised to clarify staging areas responsibility. 10. C.6 is revised to clarify liability for interconnection study costs where study requirements could not be reasonably foreseen. 11. C.7 is revised to remove Contractor liability for hazmat remediation, and to add the requirement to perform a hazmat survey at each site and notify the Government of findings. 12. C.14.19 is revised to clarify parking lot work requirements. 13. C.12.2 is revised to clarify that the C.Clifton Young FB is also an historic building.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/GSA/PBS/9PNE/GS-09P-15-KS-C-7000/listing.html)
 
Place of Performance
Address: Multiple locations in northern California and northern Nevada, California, United States
 
Record
SN03849457-W 20150823/150821234941-99aa0f553e4fbb2ad1febbbdf9af64da (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.