Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 15, 2015 FBO #5013
SOURCES SOUGHT

Y -- Fiber Optic Cable Installation - NOAA, National Centers for Coastal Ocean Science (NCCOS) Center for Coastal Environmental Health Biomolecular Research (CCEHBR) Cooperative Oxford Laboratory (COL) in Oxford, Maryland

Notice Date
8/13/2015
 
Notice Type
Sources Sought
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of Commerce, National Oceanic and Atmospheric Administration (NOAA), Eastern Region Acquisition Division-KC, 601 East 12th Street, Room 1756, Kansas City, Missouri, 64106, United States
 
ZIP Code
64106
 
Solicitation Number
NCNS4000-15-01856
 
Archive Date
9/5/2015
 
Point of Contact
NICHOLAS J. DEGUIRE, Phone: 816-426-2367
 
E-Mail Address
NICHOLAS.J.DEGUIRE@NOAA.GOV
(NICHOLAS.J.DEGUIRE@NOAA.GOV)
 
Small Business Set-Aside
Total Small Business
 
Description
The U.S. Department of Commerce (DOC), National Oceanic and Atmospheric Administration (NOAA) has a requirement to install a fiber optic connection from Building 1 Room #153 (IT LAN Room) to Building 2 (Telecommunications closet). This work is one component of a larger NOS VoIP project planned at COL. The fiber optic cable installation of this contract is required to be completed in advance of the NOS project so that all tie-ins and phone hook ups can be completed within the NOS project. Minimal disturbance of daily work tasks to COL staff by construction noise, placement of equipment, blockage of walkways, etc. is required and must be coordinated with the COL IT Systems Administrator. This contract is intended to be comprehensive and provide long-lasting and functional service of fiber optic cable to perform high quality VoIP operations at COL. The Contractor shall provide all manpower, materials, tools, supplies, transportation, ladders, lifts, barricades, signs, and all equipment incidental to and necessary for the performance of all tasks described in this statement of work. No additional money is available for additional charges to complete this project. All materials used on this project must be new and obtained from trade compliant countries. Contractor will conduct bores, provide and install 1.5" HDPE conduit from the Building 1 Boiler Room to Building 2 telecommunications closet Room, provide and install 1 ½" schedule 40 PVC conduit inside buildings as a chase for all fiber optic cable, provide and install fiber cable, properly buffer and terminate all cable runs, and fully test all installations to assure the system is fully functional for subsequent equipment hookup. The period of performance is 15 calendar days from the date of award. The estimated cost of the project is less than $25,000.00. All interested parties interested in providing a quote for this work should contact Nicholas DeGuire at nicholas.j.deguire@noaa.gov, no later than close of business on August 21, 2015. Eastern Acquisition Division, requires that all Contractors doing business with this office be registered with System for Award Management (SAM). No award can be made to a company not registered in SAM. For additional information to register in SAM, please access the following web site: https://www.sam.gov. In order to register, all firms must have a Dun & Bradstreet Number.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOC/NOAA/CASC/NCNS4000-15-01856/listing.html)
 
Place of Performance
Address: 904 South Morris Street, Oxford, Maryland, United States
 
Record
SN03838082-W 20150815/150814000054-96c3d413db5ba676e249d6d91d06daea (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.