Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 13, 2015 FBO #5011
MODIFICATION

61 -- Generac Equipment and Installation or Equal

Notice Date
8/11/2015
 
Notice Type
Modification/Amendment
 
NAICS
335312 — Motor and Generator Manufacturing
 
Contracting Office
Department of Energy, Federal Locations, Western Area Power Administration, Lakewood, Colorado, United States
 
ZIP Code
00000
 
Solicitation Number
DE-SOL-0008806
 
Archive Date
9/4/2015
 
Point of Contact
Jason Krupp, Phone: 9163534445
 
E-Mail Address
krupp@wapa.gov
(krupp@wapa.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
Please note that this is now a brand name or equal requirement. •25kW propane Generator, equivalent to the Generac model in the original spec. •Float type low coolant shutdown sensor (i.e. Murphy L150) •Replacement controllers must carry minimum factory five-year warranty •Controller must allow full programming and control access to the government •Controller software must be freely downloadable •Controller full documentation and training open to the public with no restrictions based on association (i.e. only OEM's technicians and/or dealers can become trained on controller) •Controller must allow the same access to the customer as the manufacturer's field technicians (no locked software features only accessible to those with generator manufacturer's security codes, dongles) including access to change: •All timing settings (cooldown, warmup, warning alarms, shutdown alarms) •Calibration of sensors (temp, pressure) •Error message text •Other misc. settings such as modbus, network and general configuration •One new controller must be provided (pre-programmed to be a drop-in replacement) with the generator(s) to be kept as a spare. •Control interface software and full documentation must be provided with the generator on a CD or DVD. •No curved rubber coolant hoses - all coolant hoses over 1" diameter to be no more than 6" long" •"air filter restriction gauges installed after each air filter". •UL2200 •Class H or better alternator materials •Radiator drain extension •NFPA-110 compliant battery charger •NFPA-110 alarm package •Transfer switch specs, equivalent to the model in the original spec plus: •NFPA-110 compliant •2-wire start ******RESPONSE DATE IS NOW FRIDAY 08/14 AT 6AM PST********************
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/234202b25b724ec4ee80a3e730108ca5)
 
Record
SN03833497-W 20150813/150812000252-234202b25b724ec4ee80a3e730108ca5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.