Y -- CO FLAP CR 77(5), Tarryall Creek Road

Notice Date
8/5/2015
 
Notice Type
Sources Sought
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
CO-FLAP-CR-77(5)
 
Archive Date
8/27/2015
 
Point of Contact
Craig Holsopple, Phone: 720-963-3350
 
E-Mail Address
craig.holsopple@dot.gov
(craig.holsopple@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman owned small business concerns, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov or by telefax to 720-963-3360 (Attn: Craig Holsopple) for receipt by close of business (2 p.m. local Denver time) on August 12, 2015: (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program. In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration). This information must be provided in order to determine eligibility - DO NOT SEND COPIES OF YOUR CCR PROFILE; (3) Letter from bonding agent stating your firm's capability to bond for a single project of $10 million, and your firm's aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value to the Tarryall Road project in which you performed ( as the prime contractor ) grading, drainage reconstruction, aggregate base, superpave asphalt pavement, signing, striping, new guardrail, and traffic control. State whether your firm was the prime contract or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs. PROJECT DETAILS: CO FLAP CR 77(5) Tarryall Creek Road PROJECT DETAILS: This project totals 7.42 miles roadway reconstruction of Park County Road 77, otherwise called Tarryall Creek Rd. Type of Construction: grading, drainage reconstruction, aggregate base, superpave asphalt pavement, signing, striping, new guardrail, and traffic control This project consists of: Schedule A: 4.57 miles of roadway reconstruction of Park County Road 77. Significant Items for Schedule A Include: 10,500 LF of silt fence; 11,800 LF of sediment logs; 28 acres of clearing and grubbing; 37,000 CY of roadway excavation; 1000 cuyd of subexcavation; 18,800 tons of aggregate base; 11,625 tons of superpave asphalt paving; 1489 LF of pipe culvert placement; 500 lnft of underdrain; 7,268 LF of fence; 21 acres of seeding and mulching; 420 gallons of pavement markings; 6400 flagger hours Option X: 2.85 miles of roadway reconstruction of Park County Road 77. Significant Items for Option X Include: 1,480 LF of silt fence; 5,175 LF of sediment logs; 18.5 acres of clearing and grubbing; 30,625 CY of roadway excavation; 500 cuyd of subexcavation; 11,765 tons of aggregate base; 7,385 tons of superpave asphalt paving; 1300 LF of pipe culvert placement; 890 lnft of concrete curb and gutter; 2,300 LF of fence; 7 acres of seeding and mulching; 290 gallons of pavement markings; 3200 flagger hours It is anticipated this project will be advertised in October, 2015 with construction beginning in March 2016 and extending through October 2016. Estimated total cost for the Schedule A and Option X is $7,000,000 to $10,000,000.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/CO-FLAP-CR-77(5) /listing.html)
 
Place of Performance
Address: Park County, Colorado, 80432, United States
Zip Code: 80432
 
Record
SN03825648-W 20150807/150805235852-e5175c5f78136e930a015397ad51c1a0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.