AWARD
Z -- Building 20451 NAG Restroom Remodel
- Notice Date
- 7/30/2015
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- USACE District, Albuquerque, CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, NM 87109-3435
- ZIP Code
- 87109-3435
- Solicitation Number
- W912PP-15-P-0051
- Archive Date
- 8/29/2015
- Point of Contact
- Glenda Kohlieber, 575-652-4135
- E-Mail Address
-
USACE District, Albuquerque
(glenda.d.kohlieber@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912PP-15-P-0051
- Award Date
- 7/13/2015
- Awardee
- WEIL CONSTRUCTION, INC. (363752135) <br> 3344 PRINCETON DR NE <br> ALBUQUERQUE, NM 87107
- Award Amount
- $110,787.48
- Line Number
- 0001
- Description
- This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. a.Men's Restroom Remodel Area A: 1.Contractor shall remove the existing flooring and tile cove base in its entirety and prep the floor. 2.Contractor shall remove the wall paper from the existing walls and prep for texture and paint. 3.Contractor shall remove the existing exhaust fan and clothes hangar. 4.Contractor shall remove the (3) existing urinals, (2) toilets, (2) sinks and counter top, along with the mirror and all partitions. 5.Contractor shall demo the existing shower and the soffit above the shower to provide additional head room. 6.Contractor shall remove all wainscot on the restroom walls. 7.Contractor shall remove the existing water heater in the restroom. 8.Contractor shall remove the marble thresholds. 9.Paper towel dispenser shall remain. 10.Contractor shall install new ceramic tile and ceramic cove base. 11.Contractor shall tape, texture, and paint all walls. 12.Contractor shall install a wainscot that will span the length of the urinals only. 13.Contractor shall install a new shower with a curtain and shower head. 14.Contractor shall install a new water heater above ceiling if possible that will feed the men's, women's, break room and alternate restroom. 15.Contractor shall paint the entrance door to the restroom. 16.Contractor shall install a new countertop with recessed sinks. 17.Contractor shall install new urinals (3), toilets (2), sinks (2), partitions, mirror and fixtures that will be battery operated. 18.Contractor shall install a new exhaust fan I the restroom. 19.Lockers will be removed by the user. 20.Remove and re-install the shielding curtain at the entry. b.Women's Restroom Remodel Area A: 1.Contractor shall remove the existing flooring and tile cove base in its entirety and prep the floor. 2.Contractor shall remove the wall paper from the existing walls and prep for texture and paint. 3.Contractor shall remove the existing exhaust fan and clothes hangar. 4.Contractor shall remove the (1) toilet and the existing shower. 5.The counter top, vanity, sink, paper towel dispenser and mirror shall be removed and reinstalled. 6.Contractor shall remove all wainscot on the restroom walls. 7.Contractor shall remove the existing water heater in the restroom. 8.Contractor shall remove the marble thresholds. 9.Contractor shall install new ceramic tile and ceramic cove base. 10.Contractor shall tape, texture, and paint all walls. 11.Contractor shall paint the entrance door to the restroom and the foyer area. 12.Contractor shall install new toilets (2), partitions, and fixtures that will be battery operated. 13.Contractor shall install a new exhaust fan I the restroom. c.Men's Restroom Remodel Area B: 1.Contractor shall remove the existing flooring and tile cove base in its entirety and prep the floor. 2.Contractor shall remove the wall paper from the existing walls and prep for texture and paint. 3.Contractor shall remove the existing exhaust fan. 4.Contractor shall remove the (3) existing urinals, (3) toilets, (2) sinks and counter top, along with the mirror and all partitions. 5.Contractor shall remove all wainscot on the restroom walls. 6.Contractor shall remove the marble thresholds. 7.Contractor shall install new ceramic tile and ceramic cove base. 8.Contractor shall tape, texture, and paint all walls. 9.Contractor shall install a wainscot that will span the length of the urinals only. 10.Contractor shall paint the entrance door to the restroom and foyer. 11.Contractor shall replace the second entrance door. 12.Contractor shall install a new countertop with recessed sinks (2). 13.Contractor shall install new urinals (3), toilets (3), sinks (2), partitions, mirror and fixtures that will be battery operated. 14.Contractor shall install a new exhaust fan I the restroom. 15.Contractor shall install new paper towel dispenser, trashcan and soap dispenser. d.Women's Restroom Remodel Area B: 1.Contractor shall remove the existing flooring and tile cove base in its entirety and prep the floor. 2.Contractor shall remove the wall paper from the existing walls and prep for texture and paint. 3.Contractor shall remove the existing exhaust fan. 4.Contractor shall remove (2) toilets, (1) sink and counter top, along with the mirror and all partitions. 5.Contractor shall remove all wainscot on the restroom walls. 6.Contractor shall remove the marble thresholds. 7.Contractor shall install new ceramic tile and ceramic cove base. 8.Contractor shall tape, texture, and paint all walls. 9.Contractor shall paint the entrance door to the restroom and foyer. 10.Contractor shall replace the second entrance door. 11.Contractor shall install a new countertop with recessed sinks (2). 12.Contractor shall install new toilets (2), sinks (2), partitions, mirror and fixtures that will be battery operated. 13.One toilet will be handicap accessible with grab bars. 14.Contractor shall install a new exhaust fan I the restroom. 15.Contractor shall install new paper towel dispenser, trashcan and soap dispenser.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP-15-P-0051.html)
- Record
- SN03816719-W 20150801/150730235514-82ab2e46a5733a2d5f691c4a57c7ff70 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |