MODIFICATION
N -- Category 6 cabling installation in Wellesley Island, NY
- Notice Date
- 7/27/2015
- Notice Type
- Modification/Amendment
- NAICS
- 541519
— Other Computer Related Services
- Contracting Office
- Department of Homeland Security, Customs and Border Protection, Procurement Directorate - IN, 6650 Telecom Drive, Intech Two, Suite 100, Indianapolis, Indiana, 46278, United States
- ZIP Code
- 46278
- Solicitation Number
- HSBP1015Q0133
- Archive Date
- 8/13/2015
- Point of Contact
- Gary M. Orr,
- E-Mail Address
-
Gary.Orr@dhs.gov
(Gary.Orr@dhs.gov)
- Small Business Set-Aside
- Total Small Business
- Description
- The purpose of this amendment is to provide responses to vendor questions: Form lists 2 electrical subpanels - should be circuits as listed in SOW - only 1 subpanel if even necessary According to Task 3 in the statement of work, 2 new circuits are needed at the new cabinets. Addendum "D" Contractor provided material list indicates the Contractor is to provide an electric subpanel and conduit with 2 outlets. There is an existing panel nearby, can the 2 circuits be run from this panel instead? Please advise. a. OIT states that the existing electrical panel is full and would prefer the installation of a sub panel (any location) which will give us expansion capabilities for the future. 2. section 4.2 Task 2 -states new cabinets in same location as existing racks - section 4.8 Task 8 says ITU will remove existing racks ??? Per addendum D the Contractor is to supply a floor mount 24U Dell data cabinet with fans and pdu. There are many options with a wide price range. Please provide a catalog # for the cabinet and option numbers for the pdu, fans, ground bar and any other accessories. -A Full Dell rack will fit and would allow for future expansion 2. There is 1 existing rack and 1 cabinet. Per task 8 OIT is removing the rack. Is the cabinet to remain? -The cabinet is to remain 3. Who is responsible for moving the equipment from the existing equipment rack or cabinet to the new cabinets, OIT or the Contractor? a. OIT will perform this function. Existing equipment only. 3. can new racks be located in same main equipment room - allowing continuous service a. Wellesley Island Station Border Patrol does not have a preference in location of the equipment in the room as long as the placement for equipment does not impede movement or accessibility to components by OIT personnel. All racks must be located in the main equipment room. 4. Will there be an electronic set of floor plans provided with existing connections and proposed new connections? a. Floor plans sent via email on 07/22. 5. If not is there an electronic set of floor plans available to add connections a. Floor plans sent via email on 07/22. 6. Who is responsible to connect the new voice locations to the existing system a. The Wellesley Island Station cannot answer this question. OIT must address. Still pending response. 7. There is no column to add miscellaneous parts ie Wire Mold possibly additional wire- what is on site will not complete all connections even with the 4000 additional feet listed a. There is less provided material on addendum "C" CBP material list than required to complete the installation per the statement of work. One example, per tasks 5 and 6, Contractor is to replace 60 existing Cat 5 data cables and install 24 new data cables for a total of 84. There are only (2) 24 data port patch cables provided. Is the contractor responsible for the extra patch panels required? Please advise. i. Any material not listed as available on attached material list will have to be provided by the contractor to complete the job. We knew stuff was missing. b. There is less cable on site than indicated on addendum "C" CBP material inventory list. Is the contractor responsible for the balance of cable? Please advise. i. Same as #2 c. Patch cables also applies to the above. Is the Contractor responsible for the patch cables that are lacking? Please advise. i. Same as #2 8. Is it possible to extend date until the questions are answered a. Current RFQ close date is 07/29. 9. The SOW references 60 some patch panels and drops to be installed but the pricing template shows 24. We are trying to determine what it is. a. The location requires 24 new installations and replacement of all other current cabling
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DHS/USCS/FPSB/HSBP1015Q0133/listing.html)
- Place of Performance
- Address: Wellesley Island, New York, United States
- Record
- SN03811828-W 20150729/150727235444-a7fba5d45e669314e33ed5e5c32718b7 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |