Z -- Reinforcement of Parapet, Building 102, Camp Darby (USAG Vicenza), Livorno, Italy

Notice Date
6/9/2015
 
Notice Type
Presolicitation
 
NAICS
238110 — Poured Concrete Foundation and Structure Contractors
 
Contracting Office
RCO Vicenza (PARC Africa, 414th CSB), UNIT 31401 BOX 33, APO, AE 09630
 
ZIP Code
09630
 
Solicitation Number
W912PF-15-T-0092
 
Response Due
6/23/2015
 
Archive Date
8/8/2015
 
Point of Contact
Clinton Jacobsen, 039-050-54-8363
 
E-Mail Address
RCO Vicenza (PARC Africa, 414th CSB)
(clinton.m.jacobsen.civ@mail.mil)
 
Small Business Set-Aside
N/A
 
Description
DESCRIPTION OF THE WORK: Work included in this project will consist of the reinforcement of the high part of the parapet of the balcony on the second floor of the Carabinieri Barracks, Bldg 102. The balcony is on the second floor of a building used as dormitory. The total length of the parapet is about 190 m, of which about 15 m in slope (stairs). The parapet is of plastered reinforced concrete, about 25 cm thick, with on top a cover of Trani marble projecting 1-2 cm on both sides and laid on mortar 2-4 cm thick interposed on the concrete. The total height of the parapet reaches the minimum required dimensions established by the safety standards, that is 100 cm. The mortar has lost consistency and on several areas has chalked. As a consequence the marble has detached, in some cases also taking back the entire layer of mortar. The total length of the parapet is about 190 m, of which about 15 m in slope (stairs). The scope of work consists in restoring the solidness of the parapet through the following operations, to be extended to the entire balcony: a. Removal of all sections of covering not yet detached and cleaning from mortar. b. Complete mechanical removal of all remaining mortar. c. Roughening on 10-15 cm on the vertical surfaces of the parapet close to the areas involved in the work. d. Installation of metal reinforcement, 2 mm diameter and 5x5 mm mesh, fixed with metal connectors and installed on the central line of the inserted material. e. Spreading of adhering grout consisting of synthetic rubber latex type Mapei Planicrete and subsequent leveling with a pre-mixed mortar of the controlled shrinkage type, having special hydraulic binding and aggregates of selected size Mapei Topcem Pronto; these products shall be used in the quantities and with the methods specified by the manufacturer. f. After seasoning, fixing of the marble slats perfectly plane and without interruptions using cement adhesive having high performance, of the quick setting and hydration, type Mapei Elastorapid. g. Reinforced covering of the area previously roughed on the vertical surfaces using glass fiber net resistant to alkalis Mapenet 150 (150 g/sq m) and waterproof cement mortar with fine and smooth texture Mapei Planitop 200. h. Final painting of a 20 cm wide stripe. Site Visit: There is no site visit scheduled at this time.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/6ba1c3ac8ef1ada1e79791fbb57b8140)
 
Place of Performance
Address: RCO Vicenza (PARC Africa, 414th CSB) UNIT 31401 BOX 33, APO AE
Zip Code: 09630
 
Record
SN03759048-W 20150611/150610000211-6ba1c3ac8ef1ada1e79791fbb57b8140 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.