Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 04, 2015 FBO #4941
AWARD

Z -- Renovation and addition to C-130J Fuel Cell Maintenance Hangar (TWLR092567)

Notice Date
6/2/2015
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
USPFO for Rhode Island, 330 Camp Street, Providence, RI 02906-1954
 
ZIP Code
02906-1954
 
Solicitation Number
W912LD14R0001
 
Archive Date
7/2/2015
 
Point of Contact
John Bollard, 4012754222
 
E-Mail Address
USPFO for Rhode Island
(john.e.bollard.mil@mail.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912LD-15-C-0002
 
Award Date
6/2/2015
 
Awardee
CUTTER ENTERPRISES, LLC (018890017) <br> 105 INDUSTRIAL PARK RD <br> VERNON ROCKVILLE, CT 06066
 
Award Amount
$8,265,194.00
 
Line Number
1
 
Description
PROJECT Number: TWLR092567 PROJECT SCOPE: Renovate existing 23,381 SF hangar Provide 650 SF Fire Protection Room, Provide 2,180 SF Admin Office (OLI #1), Provide 548 SF of Storage (OLI #2) Demolition of existing Equipment Storage Bldg 24 (584 SF) The existing Fuel Cell Hangar Building is a thirty year old structure that has had no substantial facility upgrades since its construction in the early 1980's. This renovation includes a new TPO roofing system over the existing Hangar Bay, exterior wall refurbishment including tuck-pointing repair of brickwork and masonry replacement a new metal siding system consisting of interior liner panel insulation, translucent clerestory panel additions, mezzanine additions, high performance coatings added throughout the Hangar Bay's interior flooring, refurbishment of existing rolling hangar doors, membrane roofing at lower roof with standing seam metal roofing at lower roof of existing building and the option to provide standing seam metal roofing at the new addition, clerestory glazing, LEED certification capability and ATFP compliance. Mechanical heating, cooling and control system upgrades shall include gas fired hot water boilers, base mounted hot water secondary pumps and associated accessories, a hot water piping distribution system, new ducted heating and ventilating systems to serve the hangar area. New outdoor air systems shall be provided for ventilation and pressurization for the aircraft fuel cells. In addition, a new exhaust system with flexible hose reel, exhaust ductwork and sidewall discharge stack is to be provided. The new supply system will include a packaged make up air unit consisting of a supply fan, filters, hot water heating coil, packaged controls, a ceiling mounted hose reel and a ducted supply distribution system. New suspended gas fired infrared tube heaters for the hanger area will be added with a vacuum system suitable for the environment and atmosphere in the hangar. The administration and training areas will include a new heating and air conditioning systems. A new snow melting system will be provided for the hangar doors. New paint arrestor filters will be provided for the exhaust air plenum of the existing paint room and a new DDC control system compatible with the central base DDC system shall be provided, consisting of control panels, unit controllers, valves, dampers, sensors, devices and wiring. This system will control and monitor all new HVAC equipment and existing baseboards and cabinet unit heaters. Plumbing upgrades includes a new aircraft wash rack system comprised of new hot water pressure with new hot and cold water distribution piping out to new hose reels located in the existing hangar space. This aircraft wash rack includes a detergent solution water recirculation system complete with a hot water return pump. The plumbing renovation also includes the removal and replacement of plumbing fixtures, storm drains, and domestic water heater including the addition of compressed air outlets, domestic water meters and sanitary waste, drain and vent system. New electrical work will be provided including new lighting fixtures, switchboards, motor control center, transformers, panel boards, feeders and raceways. New branch circuits and raceways will be installed to serve mechanical equipment, building equipment, light fixtures and wiring devices. New security system that includes Mag-locks, balanced magnetic switches, motion sensors and security cameras are included. New telecommunications systems with complete voice and a data systems infrastructure system to support voice and data communications and a public address system and a CATV distribution system. The existing fire alarm system will be replaced with a new combined addressable fire alarm/mass notification system. This system will be activated by manual and automatic means. Fire suppression systems in the building shall be installed by a combination of wet pipe sprinkler systems and a High Expansion Foam system. Exterior improvements include new parking lot and sidewalks, new fire hydrants, trash enclosure and utilities.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/NGB/DAHA37/Awards/W912LD-15-C-0002.html)
 
Record
SN03749687-W 20150604/150602234624-c2dacd623ea7b6f370a38a8321f07b0d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.