38 -- Oahe Passive Transfer Oil Containment

Notice Date
4/28/2015
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Omaha, 1616 Capital Ave, Omaha, NE 68102-4901
 
ZIP Code
68102-4901
 
Solicitation Number
W9128F-15-B-0004
 
Response Due
6/16/2015
 
Archive Date
7/16/2015
 
Point of Contact
Shanna Comparato, 402-995-2067
 
E-Mail Address
USACE District, Omaha
(shanna.m.comparato@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
On or about 13 May 2015, this office will issue Invitations for Bid for construction of the Transformer Oil Containment, Oahe Dam, Missouri River, South Dakota. The solicitation will close on or about 16 June 2015. This solicitation is RESTRICTED TO SMALL BUSINESS PARTICIPATION. A tentative site visit date will be issued with the solicitation. DO NOT submit requests for plans and specifications to the site visit personnel listed above. See 'Obtaining Solicitation Documents' below. _______________________________________________________________________________ Project Description: (Approx. quantities) 1. Main Unit Transformer Oil Containment This project is to install passive oil containment systems on ten (10) Generator Step-Up(GSU) Transformers located on the tailrace deck at the Oahe Powerhouse. Transformer 1 is a three-phase 115 kV transformer rated 103MVA and holds 4050 gallons of oil. There are 3 single-phase 230 kV transformers for banks 2, 3, and 4 for a total of 9 transformers each rated about 69 MVA and hold 4400 gallons of oil per phase. Each transformer is enclosed in concrete walls on three sides, with the downstream side open. The upstream wall is the powerhouse while the other two are firewalls. A curb will be placed on the downstream side of the powerhouse to provide enough containment to hold all of the transformer oil and the water from a 25-year, 24-hour storm event. A passive oil containment system will be placed in the lower section of each transformer vault. The passive liner will allow storm water to flow through while containing any hydrocarbons. Six-inches of fire quenching stone will then be placed on top of the liner to help extinguish puddle fires. Oil absorbing mats placed on top of the rock will be used to help collect small chronic leaks of the existing transformer to protect the life of the passive system. In the event of a catastrophic oil failure, the passive liner will solidify creating a water-tight barrier inside the vault. This will prevent any hydrocarbons from reaching the drain and being discharged into the river. Stairs may be installed to allow personnel to easily access the transformer vault. In addition to the containment on the GSU transformers, a similar passive containment system may be required the two (2)-1MVA station service transformers. The estimated construction cost of this project is between$1,000,000 and $2,500,000. _______________________________________________________________________________ The Contractor will be required to commence work within 10 days after notice to proceed and complete the work 360 calendar days after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required. Bonding documents including the power of attorney shall bear an original signature by an officer of the surety. Bidders (Offerors): Please be advised of on-line registration requirement for Representations and Certifications Application (ORCA) is now located in System for Award Management (SAM) database https://www.sam.gov/portal/public/SAM/. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to SAM. Obtaining Solicitation Documents: Solicitation documents will be posted to the web via Federal Business Opportunities (www.fbo.gov). Find solicitation announcement in Fed Biz Opps (www.fbo.gov) 1.Use the 'Quick Search' to locate the project (by entering the solicitation number) or use the advanced search features offered in the 'Find Opportunities' (large arrow in the middle of the page) or use the 'Opportunities' tab followed by the 'Advanced Search' tab. 2.By using the 'login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted. 3.Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the right side reading 'All Files' or from the 'Packages' tab. 4.If you want other vendors, sub-contractors or contractors to contact you, click on the 'Interested Vendors' tab and then 'Add me to Interested Vendors' link at the bottom of the page. Questions regarding contractual matters should be made to: Shanna Comparato 402 995 2067. Telephone calls regarding Small Business matters should be made to: 402 995 2910. Telephone calls on contents of drawings and specifications should be made to the Project Manager at: 402-995-2714 or Specification Section at: 402-995 2184.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA45/W9128F-15-B-0004/listing.html)
 
Place of Performance
Address: USACE District, Omaha Oahe Dam, Missouri River Omaha SD
Zip Code: 57501
 
Record
SN03712695-W 20150430/150428234903-5736b2f9449a1f3fb79c6730ac72a508 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.