Z -- Remove and Replace 5 High Voltage Transformers Building 1 Hines VA Hospital, Hines, Illinois 60141 - Attachment

Notice Date
4/24/2015
 
Notice Type
Attachment
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Great Lakes Acquisition Center (GLAC);Department of Veterans Affairs;3001 Green Bay Road;Milwaukee WI 53214-1476
 
ZIP Code
53214-1476
 
Solicitation Number
VA69D15B0850
 
Archive Date
7/23/2015
 
Point of Contact
mark.kissee@va.gov
 
E-Mail Address
email
(mark.kissee@VA.gov)
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
The Southern Tier Construction Team Great Lakes Acquisition Center, NCO-12, will issue an Invitation for Bid (VA69D-15-B-0850) for the Hines VA Hospital, Hines, Illinois 60141. In accordance with Public Law 109-461, the Veterans Benefits, Healthcare and Information Technology Act of 2006, and Pursuant to 38 USC 8127(d), competition is restricted to SDVOSB construction firms. The bidder is responsible to monitor and download any amendments from FedBizOps which may be issued to this solicitation. There will be scope validation meeting held for this project during the solicitation period and all prospective bidders are required to attend. Details of the scope validation meeting will be included in the solicitation package. Description of Requirement: This synopsis is not a request for quotes or proposals. This is a pre-solicitation notice that a solicitation is scheduled to be released via FedBizOpps (www.fbo.gov) in the near future detailing requirements. The Veterans Administration Great Lakes Acquisition Center intends to issue an Invitation for Bid VA69D-15-B-0850, The NAICS code is 238210 and the size standard is $15M. This acquisition will be procured pursuant to the requirements in FAR Part 14 Sealed Bidding and FAR part 36 Construction and Architect - Engineer Contracts. Phase 1- Site preparation for all (5) locations of new transformers and bus duct, installation of new slabs and bus duct. Phase 2 - Installation of new transformers and bus duct, conduit, cable, grounding, and all associated work required prior to energizing. Phase 3 - Site Restoration and incremental termination of all connections primary and secondary at the existing switchgear in building 1, one power outage of 1 hour and one power outage of 6 hours will be allowed to complete the energizing each transformer. Phase 4 - Removal of existing transformers and demolition of existing slabs and duct, and restoration of area at exiting transformers. Location 1: 1TE (500 KVA). Transformer 1TE is 4160 Volt Delta primary and 208Y/120 Volt secondary. This will include new primary and secondary underground conduit in duct bank, new primary wire, new secondary wire, new grounding system, and a new 12" concrete slab. Contractor is responsible for terminating all connections primary and secondary. New secondary conduit and wire is to terminate at the existing switchgear in building 1. Contractor to keep all Hines utilities intact at all time's except one power outage of 1 hour and one power outage of 6 hours will be allowed to complete this work. Contractor is responsible for all temporary power for any outage other than the allowed outages specified in this CLIN. Contractor is responsible for removal of old transformers, existing wiring, bus duct, concrete slabs and provide Weight tickets for all Recyclable materials leaving the campus. Contractor shall be responsible to secure the area surrounding the construction site, and to restore all areas to its preexisting state (Walls, Windows, Landscape, etc.). Location 2: 1TB (750 KVA). Transformer 1TB is 4160 Volt Delta primary and 208Y/120 Volt secondary. This will include new primary and secondary underground conduit in duct bank, new primary wire, new secondary wire, new grounding system, and a new 12" concrete slab. Contractor is responsible for terminating all connections primary and secondary. New secondary conduit and wire is to terminate at the existing switchgear in building 1. Contractor to keep all Hines utilities intact at all time's except one power outage of 1 hour and one power outage of 6 hours will be allowed to complete this work. Contractor is responsible for all temporary power for any outage other than the allowed outages specified in this CLIN. Contractor is responsible for removal of old transformers, existing wiring, bus duct, concrete slabs and provide Weight tickets for all Recyclable materials leaving the campus. Contractor shall be responsible to secure the area surrounding the construction site, and to restore all areas to its preexisting state (Walls, Windows, Landscape, etc.). Location 3: 1TD (500 KVA). Transformer 1TD is 4160 Volt Delta primary and 208Y/120 Volt secondary. This will include new primary and secondary underground conduit in duct bank, new primary wire, new secondary wire, new grounding system, and a new 12" concrete slab. Contractor is responsible for terminating all connections primary and secondary. New secondary conduit and wire is to terminate at the existing switchgear in building 1. Contractor to keep all Hines utilities intact at all time's except one power outage of 1 hour and one power outage of 6 hours will be allowed to complete this work. Contractor is responsible for all temporary power for any outage other than the allowed outages specified in this CLIN. Contractor is responsible for removal of old transformers, existing wiring, bus duct, concrete slabs and provide Weight tickets for all Recyclable materials leaving the campus.. Contractor shall be responsible to secure the area surrounding the construction site, and to restore all areas to its preexisting state (Walls, Windows, Landscape, etc.). Location 4: 1TA (500 KVA). Transformer 1TA is 4160 Volt Delta primary and 208Y/120 Volt secondary. This will include new primary and secondary underground conduit in duct bank, new primary wire, new secondary wire, new grounding system, and a new 12" concrete slab. Contractor is responsible for terminating all connections primary and secondary. New secondary conduit and wire is to terminate at the existing switchgear in building 1. Contractor to keep all Hines utilities intact at all time's except one power outage of 1 hour and one power outage of 6 hours will be allowed to complete this work. Contractor is responsible for all temporary power for any outage other than the allowed outages specified in this CLIN. Contractor is responsible for removal of old transformers, existing wiring, bus duct, concrete slabs and provide Weight tickets for all Recyclable materials leaving the campus.. Contractor shall be responsible to secure the area surrounding the construction site, and to restore all areas to its preexisting state (Walls, Windows, Landscape, etc.). Location 5: 1TC South (500 KVA). Transformer 1TC South is 4160 Volt Delta primary and 208Y/120 Volt secondary. This will include new primary and secondary underground conduit in duct bank, new primary wire, new secondary wire, new grounding system, and a new 12" concrete slab. Contractor is responsible for terminating all connections primary and secondary. New secondary conduit and wire is to terminate at the existing switchgear in building 1. Contractor to keep all Hines utilities intact at all time's except one power outage of 1 hour and one power outage of 6 hours will be allowed to complete this work. Contractor is responsible for all temporary power for any outage other than the allowed outages specified in this CLIN. Contractor is responsible for removal of old transformers, existing wiring, bus duct, concrete slabs and provide Weight tickets for all Recyclable materials leaving the campus.. Contractor shall be responsible to secure the area surrounding the construction site, and to restore all areas to its preexisting state (Walls, Windows, Landscape, etc.). All potential offerors are reminded that in accordance with Federal Acquisition Regulation (FAR) 52.204-7, System for Award Management (SAM), lack of registration in the SAM will make an offeror ineligible for contract award. Additional information or postings will be posted for viewing on FedBizOpps at https://www.fbo.gov/. The period of performance will be for 90 calendar days. NAICS Code: 238210 Size Standard $15M The Solicitation will be available on or about 5/12/2015. The magnitude of this project is between $500,000 and $1,000,000 In accordance with VAAR 819.7003 (b), SDVOSB firms must be verified in the VIP database (www.vip.vetbiz.gov) or hold a "Re-verification" symbol listed next to the firm's name (this symbol indicates that the firm is undergoing the re-verification process at CVE), prior to award of contract. If you are not registered with System for Award Management (SAM) you may request an application via phone at 1-877-252-2700 or register online at https://www.sam.gov/index.html/#1. IFB VA69D-15-B-0850 will be electronically issued on the FedBizOps websites. Any future amendments and other miscellaneous documents will be available electronically for download at the following URL: http://www.fedbizopps.gov. Interested offerors are advised to continuously check this URL for any changes to this IFB. All responsible sources may submit an offer that if timely received, will be considered. The point of contact for this procurement is Mark Kissee. Questions can be e-mailed to: mark.kissee@va.gov
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/VAGLHS/VAGLHCS/VA69D15B0850/listing.html)
 
Document(s)
Attachment
 
File Name: VA69D-15-B-0850 VA69D-15-B-0850.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2006353&FileName=VA69D-15-B-0850-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2006353&FileName=VA69D-15-B-0850-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: Hines VA Hospital, Hines, Illinois 60141
Zip Code: 60141
 
Record
SN03709910-W 20150426/150424234513-6a5fecbea6f9b23f9fad93842b510718 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.