Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 26, 2015 FBO #4870
AWARD

C -- Building 20220 Finishes, KAFB

Notice Date
3/24/2015
 
Notice Type
Award Notice
 
NAICS
238390 — Other Building Finishing Contractors
 
Contracting Office
USACE District, Albuquerque, CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, NM 87109-3435
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP-15-T-0042
 
Archive Date
4/23/2015
 
Point of Contact
Stephanie Parra, (575) 556-9940
 
E-Mail Address
USACE District, Albuquerque
(stephanie.n.parra@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PP-15-P-0020
 
Award Date
3/13/2015
 
Awardee
WEIL CONSTRUCTION, INC. (363752135) <br> 3344 PRINCETON DR NE <br> ALBUQUERQUE, NM 87107
 
Award Amount
$72,505.16
 
Line Number
0001, 0002, 0003
 
Description
This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 20220 Office Finishes. The Contractor shall: Paint the first floor in it's entirety to include the doors and frames; Patch the 1ST floor walls where damaged in order to provide a level surface for painting; Remove and reinstall the poster board located at the 1st floor East entrance of the facility once painting is complete; Paint wall heaters on the 1st floor; Paint the hallway on the 2nd floor to include the doors and frames; Paint the two stairwells; Patch the 2nd floor walls where damaged in order to provide a level surface for painting; Paint the offices on the 2nd floor, 201, 211, 211a, 210, 202, 203, 214, 212, 209, 207 and 204 to include the doors and frames; Install new stair treads and rubber risers with raised disks to top and bottom landings in the two interior stair wells, the stairs will need to be abated prior to work starting; Paint wall heaters on the 2nd floor; Design and replace the hand rails on the two interior stairs; submit a design of the handrail for approval prior to installation or fabrication and installation; Adhere new quote mark gypsum wallboard to existing vinyl faced gypsum wall board in main corridor on the 1st floor (room# 150, 151, 152, 153 and 154), extend to below acoustical ceiling; Tape and finish wall surface; Install trim molding at frames to interior doors and windows.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP-15-P-0020.html)
 
Record
SN03677232-W 20150326/150324235021-f7b544010ef11c5df9cfc45ebc1d8c23 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.