Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 06, 2015 FBO #4850
SOURCES SOUGHT

56 -- B25 Chiller Upgrade - SOW Specs Drawings

Notice Date
3/4/2015
 
Notice Type
Sources Sought
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Department of Energy, SLAC National Accelerator Lab, SLAC National Accelerator Lab, 2575 Sand Hill Road, Menlo Park, California, 94303, United States
 
ZIP Code
94303
 
Solicitation Number
SLACB25ChillerPlantUpgrade
 
Archive Date
3/21/2015
 
Point of Contact
Stephanie Pinkerton,
 
E-Mail Address
stephp@slac.stanford.edu
(stephp@slac.stanford.edu)
 
Small Business Set-Aside
N/A
 
Description
SOW, Specs, Drawings B25 Chiller Plant Upgrade The subcontractor shall furnish material, tools, equipment, labor to: 1) Remove the (E) 50 Ton McQuay Chiller (ch-603). Properly secure and LOTO all the other services per SLAC's procedures and the drawings. 2) Provide piping tie-ins for CHW and CTW during week-end shut downs to facilitate minimal service interruptions. 3) Remove the (E) Chilled Water Supply & Return (CHWS&R) piping, the (E) Cooling Tower Water Supply and Return (CTWS&R) piping, and the (E) Electrical and Control conduits and wiring serving the (E) 50 Ton Chiller to be demoed as noted on the drawings. 4) Remove the (E) Chilled Water (CHW) Pumps (total of 3) and the associated (E) Chilled Water Supply & Return (CWS&R) piping and ("E") Electrical conduits serving them as noted on the drawings. 5) Remove the (E) Variable Frequency Drives (VFD) for the CHW pumps (total of 3) and the (E) Electrical and Control conduits and wires serving them as noted on the drawings. 6) Install University furnished (N) 90 ton Chiller, as well as provide and install all associated services required for a complete Chiller installation. This includes but is not limited to providing and installing a (N) chiller Control panel and controls, piping, valves, devices, fittings, supports, labels, and accessories and Electrical and Control conduits. wiring, devices, and accessories as needed to achieve a complete and operational installation. 7) Provide and install (3) three (N) CHW Pumps and (3) three (N) ABB CGD's all rated for outdoor service along with the associated CHWS&R tie-ins, piping, valves, devices, accessories, and supports as needed to achieve a complete and operational installation. 8) Provide and install (N) Chiller Control Panel and controls as noted above all rated for outdoor service and connect them to SLAC's Building Management System (BMS) and program them as needed and per the attached drawing. Provide as-built Control drawings. 9) Provide and install (N) heavy vinyl clear strip curtains, 12" width, flat, 0.120" thicl around the (E) Chiller Pad as Option 01.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/SLAC/STAN/SLACB25ChillerPlantUpgrade/listing.html)
 
Place of Performance
Address: 2575 Sand Hill Road, Menlo Park, California, 94025, United States
Zip Code: 94025
 
Record
SN03658837-W 20150306/150304235336-893849e0f159d99f1e63b1d71ca03a26 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.