Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 06, 2015 FBO #4850
SOURCES SOUGHT

61 -- Multiple Laurch Rocket System (MLRS) M270A1 Vehicle Auxiliary Power Unit (APU) Overhaul

Notice Date
3/4/2015
 
Notice Type
Sources Sought
 
NAICS
335312 — Motor and Generator Manufacturing
 
Contracting Office
ACC- Warren (ACC-WRN)(RRAD), ATTN: CCTA-HDR, 100 Main Drive, Building 431, Texarkana, TX 75507-5000
 
ZIP Code
75507-5000
 
Solicitation Number
W911RQ-15-R-0015
 
Response Due
3/17/2015
 
Archive Date
5/3/2015
 
Point of Contact
Romona Kelly, 903-334-4605
 
E-Mail Address
ACC- Warren (ACC-WRN)(RRAD)
(romona.f.kelly.civ@mail.mil)
 
Small Business Set-Aside
N/A
 
Description
The Army Contracting Command- TACOM-Warren (RRAD) - Directorate for Maintenance, Red River Army Depot, Texarkana, Texas 75507, on behalf of the Precision Fires Rocket and Missile Systems (PFRMS) Program Management Office, hereby issues the following Sources Sought/Request for Information (RFI) to ascertain the level of interest of potential vendors desiring to contract for overhaul of M270A1 Multiple Launch Rocket System (MLRS) Vehicle Auxiliary Power Units (APU). Overhaul of M270A1 Multiple Launch Rocket System (MLRS) Vehicle Auxiliary Power Units (APU) in accordance with an approved AMCOM MLRS PFMRS PMO Performance Work Statement (PWS) dated 5 March 2015. The work shall require the contractor to provide all the transportation, parts, labor, services and supervision required to perform required overhaul. This will be a fixed priced mutiple-year requirements contract. The period of performance will be a Base Year and two (2) 12-month Option periods. The estimated minimum quantity is 18 APUs and the maximum estimated quantity is 37. The unit of issue is each. This unit is covered under this PWS is the MLRS APU - NSN 6130 01 549 0407 - Part Number 12488459 (MLS PN 306-9000) Base Year Estimate - 18 Each Option Period 1 Estimate - 10 Each Option Period 2 Estimate - 9 Each The contractor shall verify receipt of the hardware in accordance with the enclosed shipping documents. Verification will be performed to ensure the presence of all assemblies and components. When APU is received that is missing parts a report will be generated. If enough parts are missing to be deemed beyond economical repair the unit will be either returned to the government or scrapped in house according to the direction provided by the contracting office. In some cases functional testing may be omitted if visual inspection determines that a component is damaged or missing. The contractor shall inspect and evaluate the complete unit for any other obvious required repair. In addition incoming functional test may be performed to determine the unit condition. Any failures will be recorded and included within the internal evaluation form QA-092. Based on the evaluation the supply condition code will be determined. This PWS will be applicable only to APU's which are classified as CONDITION CODE F (SERVICEABLE-REPARABLE) - Economically Reparable material which requires repair, overhaul, or conditioning. PERFORM OVERHAUL The Disassembly, Repair and Assembly shall be in accordance with the applicable MLRS APU drawings, route sheets and inspection procedures. All rework operations will be accomplished according to the approved configuration lists and inspected by the contractor QA personnel. The following task is the required maintenance for overhaul level (C) repair: Change Oil Change Oil Filter (Qty 1, PN 50302800, or 50302801) Inspect Air Cooling System Repair/Replace all wiring and connectors for wear and tear Inspect all hardware wear for corrosion Change Air Filter (Qty 1, PN P822686) Clean air cooling system and air intake Replace Engine Rubber Mounts (Qty 4, PN AM MF-Small 40) Check Rectifier (Diode Assembly) Check Stator Assembly (Test Windings) Check Cooling Fan Adjust Engine Valve Clearances Replace Valve Gasket (QTY 1, PN 50290200) Replace all Rubber parts o Fan Assembly rubber mounts (Qty 4, PN 50869-1) o Muffler Support Bellows (Qty 4, PN 222646-0) o Glow plug cover (Qty 1, PN 306-0148) o Rubber bumper front cover (Qty 2, PN 51181) o Rubber bumper diode box (Qty 2, PN 9540K58) o Rubber duct APU outlet (Qty 1, PN 306-0163) o Rubber cable cover back panel (Qty 2, PN 306-0118) Replace Cables/Conduits as needed o Inspect/Repair/Replace engine harness as needed. (Qty 1, PN 306-9622) o Oil pressure switch (Qty 1, PN13502379) o Rectifier temp sensor (Qty 1, PN 13502379) o Fan temp switch (Qty 1 PN 306-9636) o Head temp sensor (Qty 1, PN 13502378) o Inspect/repair/replace conduit stator wires as needed. (Qty 1, PN 306- 0197) o Replace glow plug Replace Enclosure Insulation Panels o Service side (Qty 1, PN 306-0189) o Governor side (Qty 1, PN 306-0190) o Flywheel side (Qty 1, PN 306-0191) o Alternator side (Qty 1, PN 306-0192) o Top (Qty 1, PN 306-0193) Replace Enclosure EMI Gaskets o Panel Gasket (Qty 1, PN 306-0195-1) o Panel Gasket (Qty 1, PN 306-0195-2) o Panel Gasket (Qty 4, PN 306-0195-3) o Panel Gasket (Qty 2, PN 306-0195-4) Replace Fuel Lines as needed o APU fuel supply (Qty 1, PN 306-0177) o APU fuel return (Qty 1, PN 306-0178) o Engine fuel supply (Qty 1, PN 01353300) o Engine fuel return (Qty 1, PN 3658-1669) Replace oil drain hose assembly (Qty 1, PN 306-0142) Replace/repair actuator assembly (Qty 1, PN 306-9637) At completion of the overhaul the unit will be brought to CONDITION CODE A (SERVICEABLE-ISSUABLE WITHOUT QUALIFICATION). TESTING & INSPECTION Acceptance Testing (ATP) will be performed per procedure ATP-12488459 - Abbreviated. PREPARATION FOR DELIVERY The APU will be cleaned and painted to original specifications. Any required marking and warnings will be applied in accordance with the approved documentation. The unit will be presented to QA personnel for final approval prior to shipment. DELIVERY To ensure proper handling the APU a suitable container will be utilized. Reusable containers and cushioning may be retained for return shipment of repairable APU's. All material and containers will be marked and shipped per government instructions. WARRANTY The contractor shall guarantee level workmanship and parts for a period of 13 months from the time of shipment. SUPPORT The contractor shall provide support to the APU during the lifetime of the MLRS program. QASP The APU will be inspected at the contractor site by a DCMA Inspector before being shipped to RRAD. When received at RRAD items that are deemed non-complaint or inoperable per the SOW will be shipped back to the contractor with the contractor paying for shipping costs. Minor problems will be corrected at RRAD after consulting with the contractor.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/446402c76f58dec7f16ebaf48953890a)
 
Place of Performance
Address: ACC- Warren (ACC-WRN)(RRAD) ATTN: CCTA-HDR, 100 Main Drive, Building 431 Texarkana TX
Zip Code: 75507-5000
 
Record
SN03658120-W 20150306/150304234703-446402c76f58dec7f16ebaf48953890a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.