MODIFICATION
17 -- DRAFT DATA UPDATES and INFORMATION FOR INDUSTRY
- Notice Date
- 2/20/2015
- Notice Type
- Modification/Amendment
- NAICS
- 336413
— Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, AFLCMC / AFSC / AFNWC - HILL AFB, ., Hill AFB, Utah, 84056, United States
- ZIP Code
- 84056
- Solicitation Number
- FA8203-14-R-LGPBL1
- Point of Contact
- Timothy E. Arbon, Phone: 8017776466, David Stone, Phone: 801-777-0204
- E-Mail Address
-
timothy.arbon@us.af.mil, david.stone@us.af.mil
(timothy.arbon@us.af.mil, david.stone@us.af.mil)
- Small Business Set-Aside
- N/A
- Description
- 1) Pre-solicitation Conference a. What: Pre-solicitation Conference for LGPBL1 to walk through FBO-posted Draft RFP material to ensure industry has a clear understanding of expectations with regard to proposals in preparation for the official RFP when that time comes. Primary topics will include requisition banding, repatriation, and metrics. This event will take place in an open forum, with all attendees in the same room for the discussion. Given the limited time available, if you have specific questions you would like to ensure get addressed during this data event, please provide those questions in writing in advance of the event. All questions requested for discussion at this event must be provided electronically via email by 3:00 pm (Mountain Daylight Time) on 13 March 2015 to the Contracting Officer (Mr. Tim Arbon at timothy.arbon@us.af.mil) and the Program Manager (Mr. Dave Stone at david.stone.4@us.af.mil). All discussions will be documented throughout this event and posted to FBO. b. Who: Only those contractors who are planning to bid on LGPBL1 as a prime contractor. If said contractors elect to send representatives from any subcontractors with whom they intend to subcontract with on LGPBL1 - that is between them and those subcontractors, but please note that based on limited seating availability, each prime contractor may only send a maximum of 4 representatives. i. RSVP: Please respond with your intent to attend this event or not by no later than 3:00 pm (Mountain Daylight Time) on 27 February 2015. Make sure to provide the names and titles of each individual who will be attending. c. When: 24-26 March 2015. Travel days would be Monday, 23 March and evening of Thursday, 26 March and/or Friday, 27 March. d. Where: The location is still being finalized, but for planning purposes it will be at or near Hill Air Force Base, Utah. If not at Hill Air Force Base, then either in the vicinities of the city of Layton or Ogden, Utah. We will post the location just as soon as it is finalized. 2) BOM Material Prices a. This spreadsheet contains a breakdown of each PBL item by NSN to show unit prices for each component piece 3) DLA Drawdown a. This contains the DLA drawdown snapshot as of today. Please note that this WILL change at the time of RFP release and again at contract award. This information is only provided at this time to help for planning purposes. 4) Updated Industry Q&A a. The Industry Q&A document has been updated with most recent questions and answers posted at the top of the document.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OOALC/FA8203-14-R-LGPBL1/listing.html)
- Record
- SN03647232-W 20150222/150220234349-08b6d3f2c8ba0350c0b7c324af9064c7 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |