Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF DECEMBER 18, 2014 FBO #4772
SOLICITATION NOTICE

16 -- F-16 Aircraft Wheel Assy - New Forging Required - Melynda Ropelato - Synopsis Attachments

Notice Date
12/16/2014
 
Notice Type
Presolicitation
 
NAICS
336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, AFLCMC / AFSC / AFNWC - HILL AFB, ., Hill AFB, Utah, 84056, United States
 
ZIP Code
84056
 
Solicitation Number
FA8203-15-R-0004
 
Archive Date
3/25/2015
 
Point of Contact
Ashton R. Jones, Phone: 8017756966
 
E-Mail Address
ashton.jones@us.af.mil
(ashton.jones@us.af.mil)
 
Small Business Set-Aside
N/A
 
Description
Source Qualification Statement for the Forging Source Qualification Statement for the end item NSN Engineering Data List Attachment A First Article CDRL This is a synopsis of the requirement. After the closing date of this notice the solicitation will be issued under the same number - FA8203-15-R-0004. This requirement is limited to engineering approved sources on the Screening Analysis Worksheer (761). Any new source that would like to become qualified must follow the instructions on the Source Qualification Statements (NSN and Forging SQS's separate). The upcoming requirement is for 384 Each F-16 Aircraft Wheel Assemblies. NSN: 1630-01-606-0371LE. This item also requires a First Article (FA) submission and has a CDRL attached for the First Article. This FA requires government testing at Hill and the test report is required. FA is expected to be due 365 days from contract award and the government test center is given 120 days to test the FA from date of submission. Contractor awardee should notify the government 15 days prior to shipping FA for testing. New forging line item is also included. Pseudo NSN is listed as 1630-DV-G15-0001LE. This item is a ship-in-place item and delivery is to be determined in the proposal. Acceptance of the forging will be made by certification of the responsible DCMA Quality Assurance Representative. The contractor shall provide a letter to the forging house that states that the forging is being paid for under the determined contract number at time of award and that the government will retain unlimited usage rights to this new forging. A copy of this letter is to be provided after award to the Procuring Contracting Officer (PCO). If you have any questions or concerns please feel free to contact me directly. I will be out of the office starting 22 Dec and should be back on 5 Jan 15.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OOALC/FA8203-15-R-0004/listing.html)
 
Record
SN03597846-W 20141218/141216235027-4780c1fe88d636f2de320b24ea30bdba (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.