AWARD

Z -- BONNEVILLE DAM FIRST POWERHOUSE MAIN UNIT CIRCUIT BREAKER AND INSTRUMENT TRANSFORMERS REPLACEMENT

Notice Date
11/14/2014
 
Notice Type
Award Notice
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
USACE District, Portland, Contracting Division (CECT-NWP), P.O. Box 2946, Portland, OR 97208-2946
 
ZIP Code
97208-2946
 
Solicitation Number
W9127N-14-R-0031
 
Response Due
9/22/2014
 
Archive Date
12/14/2014
 
Point of Contact
Jeffrey Renner, 503.808.4630
 
E-Mail Address
USACE District, Portland
(jeff.s.renner@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W9127N-15-C-0002
 
Award Date
11/14/2014
 
Awardee
NOVA GROUP, INC. (066099219) <br> 185 DEVLIN RD <br> NAPA, CA 94558
 
Award Amount
$23,015,000.00
 
Line Number
0001-0035
 
Description
The purpose of this project is to improve the reliability and operability for the main unit and transfer bus breakers as well as station service equipment for Bonneville Powerhouse One in Multnomah County, Oregon. This work covers but is not limited to the removal of 480V switchgears, 2.4kV switchgears, 13.8kV switchgear, 13.8kV disconnect switches, surge equipment, 13.8kV bussing, 2.4kV bussing, 2.4kV/480V transformers, 2.4kV/208V/120V transformer, 13.8kV/2.4kV transformers, current transformers, potential transformers, protective relays, CLR's, 13.8kV Oil Main Unit Breakers (MUB) and disconnects and all associated cables and wiring. The work includes but is not limited to the furnishing and installation of new 480V switchgears, 13.8kV switchgears, 13.8kV disconnect switches, surge equipment, 13.8kV bussing, 2.4kV bussing, 13.8kV/2.4kV transformer, 13.8kV/480V transformers, 2.4kV/208V/120V transformer, high impedance ground equipment, current transformers, potential transformers, electrical interlocks, protective relays, cables, wiring, meters, CLR's, 13.8kV vacuum breakers and disconnects as well as new SCADA system. The work must be performed over limited outage periods during 3 consecutive years.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA57/W9127N-14-R-0031/listing.html)
 
Record
SN03573068-W 20141116/141114234125-fb97801343cb687f9b5289ff63e1e435 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.