Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF NOVEMBER 14, 2014 FBO #4738
SOLICITATION NOTICE

Y -- AZ FLAP 57(1), 65(1), & 81(1), Lynx Bridge, Thumb Butte Road, and Red Rock Loop Road

Notice Date
11/12/2014
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6814B00028
 
Point of Contact
Jeremiah B. Rogers, Phone: 7209633717, Aaron Sanford, Phone: 7209633090
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
This project consists of work elements in three separate locations within Yavapai County Arizona and within two forests - Prescott National Forest and the Coconino National Forest. Site 1: Lynx Creek Bridg e is located in the Prescott National Forest and near Prescott, Arizona. This site consists of replacement of a one lane bridge with a new two lane structure and associated approach roads. The bridge is located on Walker Road (CR 57). The replacement structure is a precast, pre-stressed concrete box beam structure with phased construction. Site 2: Thumb Butte Road is located near Prescott, Arizona and is located in the Prescott National Forest. Thumb Butte Road is also known as County Route 65. A portion of this roadway on each end of the route is currently paved. This project will improve the section that is unpaved with a new paved surface and improve roadside drainage. The current gravel roadway template only needs minor improvement to accommodate the paving. Site 3: Red Rock Loop Road is located near Sedona, Arizona and is located in the Coconino National Forest. This route is also adjacent to the Red Rock State Park. This route also has paved portions on each end of the route. This project will pave the gravel section between, add culvert pipes under the roadway and pave the final alignment for a consistent paved surface through the entire route. Significant Quantities: Schedule A Roadway Aggregate, Method 28,480 TN Hot Asphalt Concrete Pavement 6,880 TN Prime Coat 30,100 SY Precast, Pre-stressed Concrete Box Beam 666 LNFT Reinforcing Steel 5,500 LB Reinforcing Steel (Epoxy) 3,300 LB 24 Inch Pipe Culvert 350 LF Guardrail System G4, TY 4, Wood Posts 1,600 LF It is anticipated that this project will be advertised in November, 2014 with construction occurring from January through August, 2015. The contracting range for this project is between $3 million and $4 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6814B00028/listing.html)
 
Place of Performance
Address: Various locations within Yavapai County, AZ, Camp Verde, Arizona, 86322, United States
Zip Code: 86322
 
Record
SN03570947-W 20141114/141112234105-2fb6b1e48ece14b2d5ba3ba83227793b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.