Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF NOVEMBER 08, 2014 FBO #4732
SOLICITATION NOTICE

Y -- WORLDWIDE ENGINEERING & CONSTRUCTION (WE&C) - DRAFT Attachment L-15 SB Sub Plan Checklist - DRAFT Attachment L-5 PPI Tool Instructions - DRAFT Attachment L-4 PPQ - DRAFT Attachment L-3 PPI - DRAFT Attachment L-2 PPQ POC Summary Sheet - WE&C Contractor Question Comments Matrix - DRAFT Attachment L-10 Qualifications for Labor Category Levels - DRAFT Attachment L-14 Contractor Data Sheet - DRAFT Attachment L-12 Pricing Model - DRAFT Attachment L-7 Client Authorization Letter - DRAFT Attachment L-13 Financial Capability Risk Assessment - DRAFT Attachment L-1 Key Personnel - DRAFT Attachment L-9 Concurrent Projects Format - DRAFT L&M - DRAFT Attachment L-6 Subcontractor Consent Letter Sample - PPI TOOLS - DRAFT RFP - DRAFT Attachment L-11 Labor Rate Tables - DRAFT Attachment L-8 Choice of Competitions

Notice Date
11/6/2014
 
Notice Type
Presolicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
AFICA - AFICA- CONUS
 
ZIP Code
00000
 
Solicitation Number
FA8903-15-R-0001
 
Point of Contact
Regina Espinoza, Phone: 2103958131, Beatrice Torres, Phone: 2103958137
 
E-Mail Address
regina.espinoza@us.af.mil, beatrice.torres@us.af.mil
(regina.espinoza@us.af.mil, beatrice.torres@us.af.mil)
 
Small Business Set-Aside
N/A
 
Description
Attachment L-8 Choice of Competitions Attachment L-11 Labor Rate Tables DRAFT RFP PPI TOOLS Attachment L-6 Subcontractor Consent Letter Sample DRAFT L&M Attachment L-9 Concurrent Projects Format Attachment L-1 Key Personnel Qualifications Attachment L-13 Financial Capability Risk Assessment Attachment L-7 Client Authorization Letter Attachment L-12 Pricing Model Attachment L-14 Contractor Data Sheet Attachment L-10 Qualifications for Labor Category Levels WE&C Contractor Question Comments Matrix Attachment L-2 PPQ POC Summary Sheet Attachment L-3 Present/Past Performance Information Form (PPI) Attachment L-4 Present/Past Performance Questionaire Form (PPQ) Attachment L-5 PPI Tool Instructions Attachment L-15 Small Business Subcontracting Plan Checklist **IMPORTANT NOTICE** SOLICITATION NUMBER FOR WORLDWIDE ENGINEERING AND CONSTRUCTION (WE&C) HAS CHANGED FROM: FA8903-14-RFI_AFCEC_WEC_Construction_IDIQ TO: FA8903-15-R-0001 FOR PLANNING PURPOSES ONLY, THIS IS A REQUEST FOR SUBMISSION OF QUESTIONS CONCERNING DRAFT SOLICITATION. THIS REQUEST IS NOT A FINAL SOLICITATION. PLEASE DO NOT SUBMIT A PROPOSAL. 1. This pre-solicitation notice is being updated for the purpose of obtaining industry feedback concerning DRAFT Request for Proposal (RFP) information. Response to the request for questions is strictly voluntary and will not affect any firm's ability to submit an offer if, or when, a Final Solicitation is released. However, we highly encourage you to reply. The request is for planning purposes only and does not constitute a commitment, implied or otherwise, that a procurement action will be issued. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the submission of information in response to this notice. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations. 2. This requirement is to provide a full range of construction and engineering activities necessary to design and construct new facilities, infrastructure, repair, renovate, and/or restore existing facilities and infrastructure. The project locations will be primarily outside the 48 contiguous United States (OCONUS), remote/austere sites, high risk/contingency sites, and some projects within the 48 contiguous United States (CONUS). CONUS projects will only be executed under the WE&C if a project is determined to be complex and/or would exceed the bonding capabilities of a Small Business under the Regional Engineering and Construction (RE&C) vehicle. Examples of complex types of projects include but are not limited to: airfield paving projects, renovation of historic structures, Sensitive Compartmented Information Facility (SCIF) or related security facilities, non-standard or unique structures, and design-build projects involving specialized Anti-Terrorism/Force Protection (ATFP) requirements. 3. This is an Indefinite Delivery, Indefinite Quantity Firm Fixed Price (FFP) and Cost Plus Fixed Fee (CPFF) related to Worldwide Engineering and Construction (WE&C) Multiple Award contract. The Government intends to select approximately eleven to fifteen (11-15) contractors for the WE&C contract and award without discussions (except clarifications as described in FAR 15.306(a), but reserves the right to hold discussions if in the best interest of the Government. The ordering period is 5 years base period with three (3) one year option periods with a three (3) year performance period. 4. All questions/comments pertaining to the DRAFT RFP shall be provided to the Government for considerations in the provided matrix excel spreadsheet. The spreadsheet has a field for Section/Attachment Number, Page # / Paragraph Reference and Question/Comment. Please ensure that both sheets and fields are completed in their entirety. The Government is requesting industry input on our proposed teaming approach as described in Section L, paragraph 2.1.4. Should you have any comments/questions with this approach please address in required excel matrix spreadsheet. Also, the government is requesting industry input on the home/field labor categories (reference Attachment L-12) to ensure that your team (prime and/or teaming partners) will be able to provide a proposed rate for each category. The government's concern is we do not want to cause an offeror to break from their standard accounting practices and propose on a category that is covered within your Overhead costs. 5. Request for Questions: The Government anticipates a final Solicitation to be released in June 2015; however, this is subject to change depending on the amount of questions we receive. This notification is provided to allow early review of DRAFT solicitation documentation for this requirement. Questions concerning the DRAFT Request for Proposal (RFP) and attachments are due by 4:00 PM CT on 24 Nov 2014. 6. The PPI Tool is attached so that you may be able to download the tool to your computer to see how it works. Please be mindful that versions are occasionally updated, therefore you must use the PPI Tool that will be posted to with the final RFP. **NOTE : Due to changes in the acquisition strategy all previous questions submitted have been overcome by events and will not receive a response from contracting. Therefore, please submit all questions previously asked or new in response to this posting. Any communications with the Government from the date of this solicitation through contract award shall be directed in writing to the Procuring Contracting Officer (PCO), Ms. Beatrice Torres and Contract Specialist, Ms. Regina Espinoza at afcec.we_c.contract@us.af.mil. MISCELLANEOUS: The Key Milestones Dates for Worldwide Engineering & Construction (WE&C) have been updated as of 06 Nov 2014 (Schedule information is subject to change without notice). Please see schedule below: Milestones Dates Draft RFP Nov 2014 RFP Release June 2015 Proposals Due Aug 2015 Contract Awards Dec 2016 ATTACHMENTS: 1. DRAFT Attachment RFP 2. Attachment Questions/Comments Matrix Excel Spreadsheet 3. Draft Attachment L-1 Key Personnel Qualifications 4. Draft Attachment L-2 Present/Past Performance Questionnaire (PPQ) POC Summary Sheet 5. Draft Attachment L-3 Present/Past Performance Information Form (PPI) 6. Draft Attachment L-4 Present/Past Performance Questionnaire (PPQ) 7. Draft Attachment L-5 Present/Past Performance Information Form (PPI) Tool Instructions 8. Draft Attachment L-6 Example Format for Subcontractor Consent Letter 9. Draft Attachment L-7 Example Format for Client Authorization Letter 10. Draft Attachment L-8 Choice of Competition 11. Draft Attachment L-9 Concurrent Projects Format Examples 12. Draft Attachment L-10 Qualifications for Labor Category Levels 13. Draft Attachment L-11 Labor Rates Tables 14. Draft Attachment L-12 Pricing Model 15. Draft Attachment L-13 Financial Capability Risk Assessment 16. Draft Attachment L-14 Contractor Data Sheet WE&C 17. Draft Attachment L-15 Small Business Subcontracting Plan Checklist Previous Solicitation information (FA8903-14-RFI_AFCEC_REC_Construction_IDIQ) can be located https://www.fbo.gov/index?s=opportunity&mode=form&tab=core&id=ffdfc4298904d47a4b2ac48de1c21a9d
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/9b0489c63dcb1292e68350c9b9e07c03)
 
Place of Performance
Address: 3515 S. General McMullen, Bldg 171, San Antonio, Texas, 78226, United States
Zip Code: 78226
 
Record
SN03567806-W 20141108/141106234223-9b0489c63dcb1292e68350c9b9e07c03 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.