AWARD
M -- Operation and Maintenance of Government-Owned Facilities and Equipment, Walter F. George & George W. Andrews Lakes, Fort Gaines, GA
- Notice Date
- 11/5/2014
- Notice Type
- Award Notice
- NAICS
- 561210
— Facilities Support Services
- Contracting Office
- USACE District, Mobile, P. O. Box 2288, 109 Saint Joseph Street (zip 36602), Mobile, AL 36628-0001
- ZIP Code
- 36628-0001
- Solicitation Number
- W91278-14-R-0016
- Response Due
- 5/13/2014
- Archive Date
- 12/5/2014
- Point of Contact
- Jason Johnston, 251-690-3348
- E-Mail Address
-
USACE District, Mobile
(jason.c.johnston@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W91278-14-C-0012
- Award Date
- 9/12/2014
- Awardee
- ANDERSON CONSTRUCTION COMPANY OF FORT GAINES (033717307) <br> 58 CROZIER LN <br> FORT GAINES, GA 39851
- Award Amount
- $1,832,047.90
- Line Number
- 0001
- Description
- This contract action was not awarded as a fixed price type because uncertainties involved in contract performance did not permit costs to be estimated with sufficient accuracy to use any type of fixed price contract. As such, a cost-reimbursement type action was awarded (FAR 16.301-2). Furnish all planning, supervision, labor, equipment, material, supplies, replacement parts, and all things necessary for the Operation and Maintenance of the Walter F. George & George W. Andrews Lakes, Fort Gaines, Georgia. The Project is located on the Chattahoochee River between river mile markers 46 and 155, and is part of the Apalachicola, Chattahoochee and Flint River Project. The Project is geographically spread out over several counties, which including Early, Randolph, Clay, Quitman, Chattahoochee, Stewart, and Muscogee counties in Georgia, and Houston, Henry, Barbour, and Russell counties in Alabama. This project is over 114 miles long with over 51,000 acres of project lands and 20 different recreation areas. The project operates 5 campgrounds, 7 day use parks, 3 developed public beaches, 12 boat ramps, Power Plant, Lock and Dam, Spillway and the Resource Management Office with various other facilities contained in those areas under its operation and maintenance responsibilities. The Project leases property for 3 State Parks, 8 day use parks, 3 developed public beaches, and 12 boat ramps. It is anticipated that a Cost-Plus-Award-Fee contract will be awarded for a base year and four, one-year options. In general (not all inclusive), work will entail maintenance and repair of project structures and buildings, offices, maintenance facilities, operation areas, project roads, vehicles, floating plant, boathouses, bathhouses, washhouses, toilets, gatehouses, security and other fences, sanitary disposal systems, launching ramps, playground equipment, bulletin boards, game courts, water and electrical systems, telephone lines, picnic sites, campsites, and other related facilities. Work required to perform this type maintenance includes carpentry, masonry, electrical, mechanical, structural, plumbing, chipping, caulking, sealing, cleaning, resetting, welding and replacing parts or equipment. Additional maintenance work includes guardrails, gates, electric barrier gates, signs, bumper blocks, landscaped areas, beaches, navigation or swimming buoys, paved roads, parking lots, trails, navigation aids, courtesy docks, and boundary lines. Services to be performed include general maintenance, cleaning, custodial service, garbage removal, grass mowing, saddle dike and overlook clearing, debris removal, operation of the project visitor center, repair to riprap slopes, repair to earthen slopes, excavation, and storage and disposal of hazardous and/or toxic materials.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA01/W91278-14-R-0016/listing.html)
- Record
- SN03567197-W 20141107/141105234658-d9e628000a028e7ea38e5ed507a61929 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |