Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 10, 2014 FBO #4703
SOURCES SOUGHT

59 -- Sources Sought for Overhaul Kits for 150 kW 400 Hz Generator Sets P/O the Electric Power Plant III (EPP III) used with the PATRIOT Missile Defense System.

Notice Date
10/8/2014
 
Notice Type
Sources Sought
 
Contracting Office
ACC-APG - Aberdeen Division B, HQ CECOM CONTRACTING CENTER, 6001 COMBAT DRIVE, ABERDEEN PROVING GROU, MD 21005-1846
 
ZIP Code
21005-1846
 
Solicitation Number
MARKET-SURVEY-5704-1
 
Response Due
10/21/2014
 
Archive Date
12/7/2014
 
Point of Contact
Savino Sica, 443-861-5441
 
E-Mail Address
ACC-APG - Aberdeen Division B
(savino.w.sica.civ@mail.mil)
 
Small Business Set-Aside
N/A
 
Description
DO NOT CONTACT POSTER. FOR ALL INFORMATION CONTACT: Scott Mahoney, RDER-PRP-G, (443) 395-6242. This is a Market Survey to locate additional sources for the Overhaul Kits established for the 150 kW 400 Hz Generator Sets P/O the EPP III used with the PATRIOT Missile Defense System, NSNs: 6115-01-625-2086, PN:535.01.0386 CAGE:1VD61, 6115-01-607-7450, PN:535.01.0385 CAGE:1VD61, and 6115-01-608-5870, PN:535.01.0387 CAGE:1VD61. The EPP III is the main electric power source for the PATRIOT Missile Defense System and the overhaul kits have been established for the Reset and RECAP of the 150 kW Generator Set. This acquisition is for a five-year IDIQ of up to 75 each 150 kW Generator Set Overhaul Kits, NSN:6115-01-607-7450, up to 75 each 150 kW Generator Set Engine Overhaul Kits, NSN:6115-01-608-5870, and up to 25 each EPP III Overhaul Kits, 6115-01-625-2086, PN:535.01.0386 CAGE:1VD61. The current source for these kits is Jenoptik Advanced Systems, LLC, CAGE:1VD61 (formerly Lechmotoren US). Detailed technical data for the manufacture or acceptance of these kits is not available from the Army. Suppliers capable of furnishing these items must so indicate, by writing to Scott Mahoney at scott.mahoney2@us.army.mil. The response must include production lead time, production capacity by month, surge capacity, number of years part will be available, ranges for price breaks if applicable or any other information that could affect the acquisition, supply and delivery of the parts. The response should also include documentation such as copy of purchase order if the supplier was a vendor to the listed source or a statement from the listed source demonstrating that the supplier can, in fact, supply the Army with these items from the supplier listed above. Successful supplier may be required to warrant that the item supplied will satisfactorily perform when used for the purpose intended by the Army. For more information contact Scott Mahoney, RDER-PRP-G, (443)395-6242 or at scott.mahoney2@us.army.mil. The deadline for response is 21 Oct 2014. EMAIL ADDRESS: scott.mahoney2@us.army.mil CECOM POC
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/d870148aad15fd0077365194468dd7ff)
 
Place of Performance
Address: ACC-APG - Aberdeen Division B HQ CECOM CONTRACTING CENTER, 6001 COMBAT DRIVE ABERDEEN PROVING GROU MD
Zip Code: 21005-1846
 
Record
SN03546721-W 20141010/141008235928-d870148aad15fd0077365194468dd7ff (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.