AWARD
Y -- Building 66071 Repair Breakroom, Kirtland Air Force Base, Bernalillo County, New Mexico
- Notice Date
- 9/26/2014
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- USACE District, Albuquerque, CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, NM 87109-3435
- ZIP Code
- 87109-3435
- Solicitation Number
- W12PP-14-T-0140
- Archive Date
- 10/26/2014
- Point of Contact
- Karen Irving, (505) 342-3356
- E-Mail Address
-
USACE District, Albuquerque
(karen.k.irving@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912PP-14-P-0149
- Award Date
- 9/26/2014
- Awardee
- DESERT SAND BUILDERS, INC. (938102142) <br> 52 BERTA DR <br> EDGEWOOD, NM 87015-8002
- Award Amount
- $68,740.44
- Line Number
- 0001
- Description
- This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. Demolition: Contractor shall remove existing wall covering and existing gyp.bd. from west wall to column, as indicated on drawings. Contractor shall remove existing electrical duplex, j-box and wire as indicated on drawings. Contractor shall remove existing COMM, conduit, j-box, and cabling. Contractor shall salvage for relocation. Contractor shall remove existing LAN, exposed wire molding, and cabling. Contractor shall coil cable above ceiling for future use as indicated on drawings. Contractor shall remove existing wall covering and prep wall for new finish, refer to key note #19, as indicated on drawings. Contractor shall saw cut floor to gain access to existing sewer line, provide and install new sink drain line to existing sewer, back fill and compact per city of Albuquerque Engineering Guides. Contractor shall keep existing electrical and communication items as indicted on drawings. Contractor shall patch and prep existing walls for new finish, as indicated on drawings. Contractor shall patch holes and sand existing door for new finish. Contractor shall remove existing chipper lock, salvage to user, door handle, latch bolt as indicated on drawings. Contractor shall remove existing metal striker from frame, plug hole with a paintable material as indicated on drawings. Contractor shall remove existing flooring and wall base in their entirety Prep floor and wall for new wall base and flooring as indicated on drawings. Construction: Contractor shall provide and install new 5/8 quote mark water resistant gypsum board, tape, float, texture and paint as indicated on drawings. Contractor shall provide and install new 1/4 quote mark Gyp. bd. over existing wall covering and provide new finish as indicated on drawings. Contractor shall provide and install new electrical as indicated on drawings. Contractor shall provide and install new faucet as indicated on drawings. Contractor shall provide and install new under counter stainless steel sink as indicated on drawings. Contractor shall provide new texture and paint to existing walls as indicted on drawings. Contractor shall provide and install two (2) new refrigerators, as indicated on drawings. Contractor shall provide and install new copper water line to refrigerator on the west wall as indicated on drawings. Contractor shall prep existing door frame and paint as indicated on drawings. Contractor shall provide and install new vent line at sink and tie into existing roof venting line above ceiling. Contractor shall provide and install new push plate and pull handle on existing door as indicated on drawings. Contractor shall provide new stain clear finish to existing door. Contractor shall provide and install new flooring and wall base as indicated on drawings. Contractor shall provide and install new j-box, wire, conduit, switch and stainless steel switch plate, to be wired to new garbage disposal as indicted on drawings. Contractor shall provide and install new transition strip between new floor and existing hallway carpet as indicated on drawings. Contractor shall provide and install two (2) new solid surface counter tops one (1) with integral 4 quote mark back splash and one without back splash as indicated on drawings. Contractor shall provide and install new garbage disposal unit as indicated on drawings. Contractor shall provide and install new Plastic Laminated base and upper cabinets as indicated on drawings. Contractor shall provide and install new kick plates to the existing door as indicated on drawings.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP-14-P-0149.html)
- Record
- SN03533929-W 20140928/140927062322-f0d68a17df38d19e17d69d5ebcd7c777 (fbodaily.com)