Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 27, 2014 FBO #4690
AWARD

45 -- Maintenance, Inspection and Certification of Smoke Analyzers, USAG Vicenza, Italy

Notice Date
9/25/2014
 
Notice Type
Award Notice
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
RCO Vicenza (PARC Africa, 414th CSB), UNIT 31401 BOX 33, APO, AE 09630
 
ZIP Code
09630
 
Solicitation Number
W912PF14T0070
 
Response Due
8/27/2014
 
Archive Date
10/25/2014
 
Point of Contact
Roberto Schiavon, +39 0444 713917
 
E-Mail Address
RCO Vicenza (PARC Africa, 414th CSB)
(roberto.schiavon.ln.asc@mail.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PF14P0127
 
Award Date
9/19/2014
 
Awardee
PALLADIO IMPIANTI SRL (428376982) <br> VIA COLDERUGA 118 <br> LONGARE, VICENZA 36023
 
Award Amount
$7,942.52
 
Line Number
0001-0003, 7500
 
Description
Maintenance, Inspection and Certification of Smoke Analyzers, USAG Vicenza, Italy. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform smoke analyzer maintenance services at Boiler Plant, Building # 206, at Caserma Ederle, Vicenza, Italy. The contract will require the inspection and maintenance of analyzers, unscheduled maintenance and repair, including spare parts to be replaced during scheduled and unscheduled maintenance. The scheduled maintenance, required every 2 months (6 services a year) will be done on the following equipment: Combustion Recording Unit AN750-4C; Combustion smoke analyzers AN510CNS; Smoke washing treatment tank unit BL010; Zirconium oxide feelers TS236; Smoke temperature feeler TS345; Room/Comburent temperature feeler TS346; Operational Software SW750RC and will consist in checking the effectiveness of the functioning of the following equipment: smoke probes; filters and replacement of activated carbon; coalescence cartridge; flow meter; software system and updating as needed. It will include the cleaning of samples collecting tubing and perform general survey of equipment. Also, the contractor will verify the calibration of CO probe sensor, the calibration gas sensor in the combustion chamber, the transmitter functions, four (4) each oxygen probes and replace as needed and verify and clean the following: oxygen probe; oxygen filter. The unscheduled maintenance for the above mentioned tasks might be requested by the US Government up to one (1) unscheduled repair service in case of equipment failure.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/b2c5e72e2bdcb908ab84205105cacb7b)
 
Record
SN03529287-W 20140927/140926000522-b2c5e72e2bdcb908ab84205105cacb7b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.