AWARD

Z -- Replace Transformer Station, Building 543, Tower Barracks USAG Bavria

Notice Date
9/19/2014
 
Notice Type
Award Notice
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
RCO Grafenwoehr (PARC Europe, 409th CSB), UNIT 28130, APO, AE 09114
 
ZIP Code
09114
 
Solicitation Number
W912PB-14-B-8013
 
Response Due
8/12/2014
 
Archive Date
10/19/2014
 
Point of Contact
Adebowale Goyea, 01711979642
 
E-Mail Address
RCO Grafenwoehr (PARC Europe, 409th CSB)
(adebowale.o.goyea.mil@mail.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PB-14-C-8008
 
Award Date
9/18/2014
 
Awardee
Actemium Cegelec GmbH (332651681) <br> Gutenstetter Str. 10-12 <br> N rnberg, Bayern 90449
 
Award Amount
$468,205.15
 
Line Number
0001
 
Description
Replace Transformer Station, Building 543, Tower Barracks USAG Bavria. This project specifies the following work: The construction site is located within the Training Area Grafenwoehr. - Disassembly of the existing medium voltage and low voltage installation devices of the old transformer station, Building # 502, consisting of: 2 each existing oil transformer 630 kVA 1 each existing medium-voltage switching system consisting of 13 each MS-cells, 1 each existing 60 V battery system 1 each existing low-voltage switching system, l x w x d = 4.0 m x 2.0 m x 0.6 m, 1 each existing wall-mounted power panel for the EMCS, Disassemble all existing medium-voltage cables, low-voltage cables and EMCS cables and/or reinstall in the new transformer station. Disassemble all existing metal structures. Remove the existing, asbestos-containing partition walls built in stud wall construction. - Demolition of the existing transformer building, Building # 543. - Construction of a new transformer building with cable vault and gable roof, roof slope 30 degrees. Size of building: approx. 8.90 m x 3.0 m, clear height 2.60 m. Size of cable vault of reinforced concrete: 0.90 m high. - Installation of a medium-voltage switching system 24 kV consisting of: 2 each 24 kV transformer control panels 3 each 24 kV circuit-breaker section 1 each 24 kV secure cable control panel with circuit breaker as backup cell 2 each 20 kV oil transformers 400 kVA - Installation of a low-voltage switching system consisting of: 2 each transformer circuit-breakers 1000 A 1 each busbar 2000 A 18 each fuse load isolating bars 400 A 4 each fuse load isolating bars 160 A - 1 each cross connection box (EMCS) as stationary cabinet. - Relocate of existing waterline DN 150 - Provide temporary arrangements ( EMCS cabling) to maintain monitoring and control of the watersupply system. - Provide temporary arrangements ( 20 kV cabling ) for the entire construction period. - Relocate of existing telephon cable from 5th Signal - Provide 2 access roads for the new transformer station. Pave access roads leading to the two front sides. Restore the adjacent parking areas as well as grass surfaces.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/a7fa587f521c22cf3f55623701c7579f)
 
Record
SN03521179-W 20140921/140920000333-a7fa587f521c22cf3f55623701c7579f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.