Y -- LEWIS & CLARK NATIONAL FOREST - Choteau Work Center Pump House Replacement - Solicitation 1

Notice Date
8/12/2014
 
Notice Type
Modification/Amendment
 
NAICS
238110 — Poured Concrete Foundation and Structure Contractors
 
Contracting Office
Department of Agriculture, Forest Service, R-1 East Side Acquisition Team: Beaverhead-Deerlodge; Custer; Helena; Gallatin; Lewis & Clark NFs; Dakota Prairie NG, Montana, United States
 
ZIP Code
00000
 
Solicitation Number
AG-03K0-S-14-0020
 
Response Due
8/27/2014 4:00:00 PM
 
Archive Date
9/30/2014
 
Point of Contact
Lisa Rakich, Phone: 406-683-3968, Dan Woods, Phone: 406-697-7750
 
E-Mail Address
lrakich@fs.fed.us, dewoods@fs.fed.us
(lrakich@fs.fed.us, dewoods@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
SF-25A Experience Questionnaire Specifications Quote Form Solicitation Y- Choteau Work Center Pump House Replacement LOCATION: Choteau Work Center (WC) on the Rocky Mountain Ranger District, Lewis and Clark National Forest, Teton County, Montana. Choteau WC is located approximately one-half mile northwest of Choteau, MT on U.S. Highway 89. DESCRIPTION OF WORK A. Furnish all labor, materials, equipment, supervision, and transportation necessary to complete the project in accordance with the drawings and specifications. B. The major items of work include the following: 1. Demolition work including the removal of one small wood framed pump house and flat concrete slab. 2. Furnish and install new precast concrete pump house, including a compacted gravel pad for the pump house, and associated electrical and mechanical work in accordance with the drawings and specifications. 3. Install a new electrical supply line from meter base, located at garage, to new circuit breaker load center in new precast concrete pump house. 4. Install new submersible well pump branch circuit from new circuit breaker load center in the new precast concrete pump house to existing wellhead. 5. Install two new pressure tanks, pressure switch, pressure gauge, pressure relief valve, and new plumbing in new precast concrete pump house. 5. Work required at wellhead includes: installing a new pitless adapter, new 1-1/4-inch galvanized steel drop pipe, new 4-inch submersible pump, new submersible pump electrical cable, new vented well cap, and other associated work items. START OF WORK It is anticipated work will begin approximately September 2014. Construction Magnitude: Between $25,000 and $100,000
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/398/AG-03K0-S-14-0020/listing.html)
 
Place of Performance
Address: Rocky Mountain Ranger District, 1102 Main Ave. NW, Choteau, Montana, 59422, United States
Zip Code: 59422
 
Record
SN03461427-W 20140814/140813022007-24f858076ecbcc3988a8cb2a3929caa4 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.