N -- DA Piping ReDesign/ Bedford Boiler Plant - Attachment

Notice Date
7/29/2014
 
Notice Type
Attachment
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Department of Veterans Affairs;VAMC Manchester;718 Smyth Road;Manchester NH 03104
 
ZIP Code
03104
 
Solicitation Number
VA24114Q0586
 
Archive Date
8/7/2014
 
Point of Contact
Julie Lemire
 
E-Mail Address
yst
 
Small Business Set-Aside
Total Small Business
 
Award Number
VA241-14-C-0127
 
Award Date
7/28/2014
 
Awardee
DILLON BOILER SERVICES CO., INC.;380 CRAWFORD ST;FITCHBURG;MA;014206806
 
Award Amount
$37,654.00
 
Line Number
n/a
 
Description
Scope of Work Replace Boiler Plant Deaerator Piping Vendor shall, provide specifications, drawings, labor, materials, tools and equipment necessary for the installation of a new steam supply piping system for Building #22 Boiler Plant Deaerator Tank Steam Supply System. Steam supply system shall be installed in accordance with current VA Construction Standards, VHA Safety Device Testing Manual (edition 2008-062 or C.E.) and ASME standards. Vendor's installation shall include the time required for all site visits, and any verbal & electronic communication needed to gather information for the piping & equipment installation. Installation for the new piping system will be from the supply valve connection off the main header to the connection at the Deaerator dome inlet, to include all valves, safety valves, pressure reducing valves, gauges, by-passes etc., and new catwalk as required by VA standards & testing manuals. Vendor will meet with the Boiler Plant Supervisor in the Plant, to review the installation parameters at the earliest stage, and prior to final submissions. The new system shall be installed, in parallel, with the existing system remaining operational, until the new system is considered accepted for operation. The final tie-in or shutdown is then not to exceed one day. No changes to this Scope of Work without prior approval of the Contracting Officer.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/MaVAMC608/MaVAMC608/Awards/VA241-14-C-0127.html)
 
Document(s)
Attachment
 
File Name: VA241-14-C-0127 VA241-14-C-0127_1.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=1530510&FileName=VA241-14-C-0127-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=1530510&FileName=VA241-14-C-0127-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Record
SN03442100-W 20140731/140729235647-39c4c1e19bc2d7ad63da53c55c8a90db (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.