Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 25, 2014 FBO #4626
DOCUMENT

C -- RFP CONTRACT #: VA243-14-C-0168 PROJECT # 630A4-14-447 PO # 630C4 DEMOLITION OF BUILDINGS 165 & 166 - Attachment

Notice Date
7/23/2014
 
Notice Type
Attachment
 
NAICS
541330 — Engineering Services
 
Contracting Office
Department of Veterans Affairs;James J. Peters VA Medical Center;Network Contracting Office 3 (10N3NCO);130 West Kingsbridge Road;Bronx NY 10468-3904
 
ZIP Code
10468-3904
 
Solicitation Number
VA24314R1090
 
Response Due
9/30/2014
 
Archive Date
12/29/2014
 
Point of Contact
Vladimir.Stoyanov@va.gov
 
E-Mail Address
Contract Specialist
(Vladimir.Stoyanov@va.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
Scope of Work: 1.Remove existing Building # 3 and disconnect and cap all utilities lines underground (2 feet minimum). 2.Incorporate service of certified Industrial Hygienist (I.H.) to prepare the abatement documents (drawings and specifications), and review all asbestos submittals. 3.Prior to demolition, the contractor shall perform a complete Asbestos abatement of the entire building. 4.Incorporate all necessary construction phasing as required to implement the construction to avoid blocking roadway, parking lots, and disrupting the medical center operation. 5.Provide 7ft (seven) high, chain-linked fence along perimeter of building during demolition. Additional protection may be necessary, at the discretion of the project engineer (i.e. Jersey barricades, metal plates, etc ¦). 6.All services such as water/sewer, electric, and gas shall be disconnected and removed from the equipment and structure(s) accordingly. All lines serving the building to be demolished shall be capped with appropriate plumbing devices. 7.Upon completion of the Asbestos abatement, Bulldozing of building #3 is to be conducted, on weekends only (Friday evening to Sunday). 8.Properly dispose of all waste, debris, material, and equipment in accordance with applicable local and state laws. All recycle materials must be recycled accordingly. 9.Upon completion of the demolition, the contractor shall provide any topsoil or clean fill dirt that may be needed to fill voids, depressions or holes resulting from the demolition process. The demolition site shall be compacted, graded and free from protrusions, demolition debris and abrupt edges. 10.Contractor shall provide As-built drawings within 30 Calendar Days after the project is completed. 11.Contractor shall have access to all available "As-Built" drawings. 12.All work shall conform to VA criteria and regulation. Design shall comply with latest NFPA 101 Life Safety, NFPA 99 Health Care Facilities, and VA Design Standards and Criteria.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/BroVANAP/VAMD/VA24314R1090/listing.html)
 
Document(s)
Attachment
 
File Name: VA243-14-R-1090 VA243-14-R-1090_1.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=1516776&FileName=VA243-14-R-1090-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=1516776&FileName=VA243-14-R-1090-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: UNITED STATES DEPARTMENT OF VETERANS AFFAIRS;NEW YORK HARBOR HEALTHCARE SYSTEM ST. ALBAN CAMPUS;179-00 LINDEN BLVD.;ENGINEERING SERVICE (138);ST. ALBANS, NY
Zip Code: 11425
 
Record
SN03435734-W 20140725/140724000330-b5afaf754fb530519b9762d542408b85 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.