Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 12, 2014 FBO #4613
SOURCES SOUGHT

N -- elecrical installation

Notice Date
7/10/2014
 
Notice Type
Sources Sought
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of the Air Force, Air Education and Training Command, Laughlin AFB Contracting Flight, 171 Alabama Ave, Bldg 7, Laughlin AFB, Texas, 78843-5102, United States
 
ZIP Code
78843-5102
 
Solicitation Number
F2R2A14181A001
 
Archive Date
8/17/2014
 
Point of Contact
Michael R. Bailey, Phone: 8302984965
 
E-Mail Address
michael.bailey.23@us.af.mil
(michael.bailey.23@us.af.mil)
 
Small Business Set-Aside
N/A
 
Description
THIS IS A SOURCES SOUGHT ANNOUNCEMENT FOR THE PURPOSE OF CONDUCTING MARKET RESEARCH. THIS IS NOT A REQUEST FOR PROPOSAL. The purpose of this sources sought notice is for information gathering and planning purposes only for a one time installation service to be conducted on Laughlin AFB, TX. This is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. SYNOPSIS: The 47th Contracting Flight, Laughlin AFB TX, is considering the procurement of the following installation service. This notice does not obligate the government to award a contract or any other type of contractual document. CLIN 0001 - 1 each Installation of two frequency converter connections to Bldg. 211 mechanical room. Frequency converters are: Cavotec Inet US, Inc., P/N 10050AAC64-50. 480 volt input power, 60 HZ 3 phase, 115/230 colt output power, 400 Hz, 3 phase 50KW. One input power connection required to each frequency convertor consisting of 4 wires A-B-C phase plus ground. One output power convertor to each frequency convertor consisting of 4 wires A-B-C phase plus ground. Wires must be run in conduit from power supply boxes to converters and from convertors to output power boxes. Wire size should be 4-0 gauge. The distance between the power box and the first frequency converter is 60 ft., between the power box and the second frequency convertor is 40 ft. Access hole, 2 each, will need to be drilled into each convertor (one for input power and one for output power). Grounds will be connected to the ground grid along the Bldg. 211 wall. Please provide a statement that contains the following: - Capability of providing this service - Time required to complete installation - Small business size status of the company NOTE: All vendors must be currently registered in the System for Award Management (SAM) in order to be eligible for a contract award. That website is https://www.sam.gov. Please send statements to Michael.bailey.23@us.af.mil. This sources sought will close 1300 Central time, 17 July 2014.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AETC/LaugAFBCS/F2R2A14181A001/listing.html)
 
Place of Performance
Address: Laughlin AFB, Laughlin AFB, Texas, 78840, United States
Zip Code: 78840
 
Record
SN03421107-W 20140712/140710235521-977aee9545332890e14624773e4244ad (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.