MODIFICATION
44 -- TIB STEAM BOILER
- Notice Date
- 5/14/2014
- Notice Type
- Modification/Amendment
- NAICS
- 333414
— Heating Equipment (except Warm Air Furnaces) Manufacturing
- Contracting Office
- USGS OAG DENVER ACQUISITION BRANCHPO BOX 25046204 DENVER FEDERAL CENTERDENVERCO80225-0046US
- ZIP Code
- 00000
- Solicitation Number
- G14PS00281
- Response Due
- 5/22/2014
- Archive Date
- 6/21/2014
- Point of Contact
- Donald Downey
- E-Mail Address
-
ddowney@usgs.gov
(ddowney@usgs.gov)
- Small Business Set-Aside
- N/A
- Description
- THIS IS NOT A PRE-SOLICITATION. This is the actual solicitation. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 13, as supplemented with additional information included in this notice. The solicitation number is G14PS00281 and is issued as Request for Quote (RFQ). The solicitation document and incorporated provisions and clauses are those in effect in the Federal Acquisition Regulation (FAR). The associated North American Industrial Classification System (NAICS) code for this procurement is 333414 Heating Equipment (except Warm Air Furnaces) Manufacturing with a small business size standard of 500.00 employees. This requirement is a not a Small Business set-aside; all qualified offerors may submit quotes. The US Geological Survey, USGS National Wildlife Health Center, 6006 Schroeder Road, Madison WI 53711, requires a new steam boiler, including the removal and disposal of the existing boiler and the installation of the new boiler. For more information please go to www.fedconnect.net. Amendment 000001 was Questions and Answers No. 1 and No. 2; from the 04/08/2014 Site Visit; Amendment 000002 lifted the small business set-aside restrictions. FAR Clause 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644) no longer applies to this solicitation; Amendment 000003 scheduled the 05/08/2014 Site Visit/Tour; and Amendment 000004 adds 05/08/2014 Site Visit Questions and Answers No. 3 through No. 7, and, adds the May 8, 2014 Revision to SECTION 235313 - BOILER FEEDWATER PUMPS as Attachment 4. Question 3: What is the latest date possible for not requiring the temporary boiler? Answer: October 31. Question 4: What is the expected timeframe for contract to be awarded after closing date? Answer: Estimated within 30 days. Question 5: Feed water tank, drawings call for stainless steel however, CTA specs states tank is carbon. Which material is required? Answer: The 5/8/2014 Revision, RFQ Attachment 4 changes carbon to stainless steel. Question 6: There is no external access for temporary boiler, holes may need to be put in wall/cuts made to fan casing. Where can the piping for temporary boiler system be installed? Answer: No additional holes or cuts are required. M202 indicates using the unused combustion air intake louvers as the temporary piping routing into the boiler room. Question 7: Note 19 is not in drawing on plan, sheet M102. Which applies? The written descriptions superseded the drawings. Questions/comments received during the 5 work days prior to the closing date will not be considered timely and may not be answered/receive response. This RFQ closes 05/22/2014 at 1700 ET. Quote Packages shall be sent/received electronically only; either by using the FedConnect system (www.fedconnect.net) or by email to Don Downey at ddowney@usgs.gov. Quote packages shall consist of two volumes. Volume I shall be the Non-Price Support Documentation. Volume II shall be the Price Quote documents.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/USGS/USGS/G14PS00281/listing.html)
- Record
- SN03366539-W 20140516/140514235132-3a701d697b9d698eb226bd2851c3d997 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)