Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 07, 2014 FBO #4547
MODIFICATION

Y -- Electrical Services for four streamgages located in Ohio

Notice Date
5/5/2014
 
Notice Type
Modification/Amendment
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
USGS OAG DENVER ACQUISITION BRANCHPO BOX 25046204 DENVER FEDERAL CENTERDENVERCO80225-0046US
 
ZIP Code
00000
 
Solicitation Number
G14PS00228
 
Response Due
5/12/2014
 
Archive Date
6/11/2014
 
Point of Contact
Lisa Hayes
 
Small Business Set-Aside
N/A
 
Description
NOTE: THIS IS AN AMENDMENT TO SOLICITATION NOTICE. PLEASE SEE RFQ G14PS00228 Amendment 000002 FOR FULL DETAILS VIA FEDCONNECT AT https://www.fedconnect.net/FedConnect/ The reason for this amendment is to: 1. Extended the Response Due Date to May 12, 2014. 2. Changed the Site Visit Date to Wednesday, May 7, 2014. 3. Changed the Question - Cutoff date to Friday, May 9, 2014. 4. Changed the Period of Performance to May 19, 2014 through May 30, 2014. 5. Task II - Deleted first bullet in its entirety from Coordinate with the power company to determine where the meter base needs to be installed and install the meter base and necessary meter-base support structures in the agreed upon location. The power company will provide the meter base, and replaced with Coordinate with the power company to set a post with the meter base next to a telephone pole that the power company is using for their power line. The telephone pole is located approximately 80 feet north of the streamgage house. 6. Task II - Added second bullet to read Horizontal directional drilling is required to install the conduit and electric line underneath the park road. Excavation or trenching between the post with the meter base and the north side of the park road and between the streamgage house and south side of the park road is required. 7. Task II Deleted the second sentence in bullet three from All above and below ground conduit and wire and connections between the interior breaker panel to the meter base will be performed by the contractor to Excavation or trenching between the streamgage house and power-companys electric pole for underground conduit and wire connections is required by the power company and will be performed by the contractor. Install sufficient conduit and wire from meter base to electric supply so the power company can connect the wire to their service. 8. Deleted Paragraph 3.9 - Contractor Qualifications from the Statement of Work. 9. Deleted the last sentence "The offeror shall also provide proof of any state or county licenses and certifications needed for the work per the Statement of Work" from Evaluation Factor A. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/USGS/USGS/G14PS00228/listing.html)
 
Record
SN03357255-W 20140507/140505234547-3a9831053ee77a639d000b0163cb7f4b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.