Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 01, 2014 FBO #4541
SOURCES SOUGHT

Z -- Sediment_Removal_Lakota_Lake_Bismarck_Lake_Black_Hills_NF - Form-SourcesSought

Notice Date
4/29/2014
 
Notice Type
Sources Sought
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-2 Black Hills National Forest, 1019 N Fifth St, Custer, South Dakota, 57730-8214, United States
 
ZIP Code
57730-8214
 
Solicitation Number
AG-67T0-R-14-0043_SedimentRemoval
 
Archive Date
6/6/2014
 
Point of Contact
Brenda J Anderson, Phone: 605-673-9323
 
E-Mail Address
bjanderson@fs.fed.us
(bjanderson@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Description
Sources Sought Form Do Not Send Pricing! Seeking interested Vendors for dredging work. Market Research is being performed to determine the best method to advertise the Government's needs. Responses received will assist in determining if there is adequate interest to set this project aside for any of the Small Business Economic Programs. Please return the attached form to provide requested information. The Black Hills National Forest has two additional lakes identified for sediment removal contract opportunities to remove sediment from the following sites: •Site One: Remove an estimated 15,000 C.Y. with an option of an additional 5,000 CY of sediment from Lakota Lake while diverting water through the lake during construction, and hauling sediment to nearby disposal sites to be reshaped at a later date. The lake will be drained in late fall of 2014 with work scheduled to start as soon as ground freezes allowing equipment to operate in the lake basin. •Site Two: Remove an estimated 20,000 C.Y. with an option of an additional 5,000 CY of sediment from Bismarck Lake and hauling sediment to nearby disposal sites to be reshaped at a later date. The lake will be drained in late fall of 2014 with work scheduled to start as soon as ground freezes allowing equipment to operate in the lake basin. Bonding will be required for the full amount of this project. The anticipated value of the projects will be between $150,000.00 and $500,000.00 per site. The use of bio-based products is anticipated in the performance of the contract. Information on Bio-based products can be found at: http://sftool.gov/green-products/8/miscellaneous *To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/7b95c705dd893d8315f80bbb76753504)
 
Place of Performance
Address: Lakota Lake, Hwy 16A eight miles North of Hwy 36 near Hermosa SD Pennington County SD, Bismarck Lake, Hwy 16A four miles East of Custer SD, Custer County SD, South Dakota, United States
 
Record
SN03350804-W 20140501/140429234057-7b95c705dd893d8315f80bbb76753504 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.