AWARD

99 -- ASPHALT REPAIRS, PAVING AND VOIDS AT BUILDING 15 PARKING LOT AREA, NAVAL MEDICAL CENTER SAN DIEGO, CALIFORNIA

Notice Date
4/18/2014
 
Notice Type
Award Notice
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
N62473 NAVFAC SOUTHWEST, SAN DIEGO FEAD/CODE ROPMD Naval Base San Diego 2730 McKean Avenue/Building 121 San Diego, CA
 
ZIP Code
00000
 
Solicitation Number
N6247314Q4008
 
Archive Date
4/30/2014
 
Point of Contact
Mary Q. Lujan
 
E-Mail Address
an
 
Small Business Set-Aside
N/A
 
Award Number
N6247314M4008
 
Award Date
4/18/2014
 
Awardee
Portillo Concrete Inc. (DUNS 043675615)<br />
 
Award Amount
$76,419.00
 
Line Number
0001
 
Description
Demolition - sawcut, demo and remove all paving and base material that does not meet the 95% compaction criteria as identified by previous site exploration, but the areas of deficiencies are not limited to those defined by that study. Demo sidewalk in area of voids directly below the sidewalk. Barriers shall be placed around unfinished work to prevent safety mishaps.Install a new sidewalk & curb where it is to be cut out in the void area to match existing elevations.Install new hot mix asphalt paving in two 2 lifts over areas where existing paving had to be removed to correct the unstable, eroded or poorly compacted areas. Cold mill existing asphalt where transitioning to adjacent paving, ribbon gutters, manhole covers, concrete appurtences, catch basins and vaults so that a minimum of 1 depth of new AC is maintained. Grind all areas level that are bulged above adjacent finish grade. Correct any trench sinking prior to paving, excavating and recompacting the base material to 95%. Compaction reports to be submitted to the FEAD at NMCSD. At the 9 x18 ADA Van Accessible parking and 8 x 18 loading space on the passenger side, and the standard accessible angled parking stall to the east, build up an AC pad that is 2% maximum slope in all directions, tying or blending into the existing sidewalk/curb level directly in front of the main entry sidewalk and extending the built up ramp to the padded area at a maximum slope of 5% to the surrounding parking/driveway areas.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N68711V/Awards/N6247314M4008.html)
 
Record
SN03342462-W 20140420/140418234332-b9b8bc3729349dcfc7440e8bbcece582 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.