Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 19, 2014 FBO #4529
MODIFICATION

Y -- AZ FLAP 249(1), Three Forks Road - Solicitation 1

Notice Date
4/17/2014
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-14-B-00006
 
Archive Date
7/1/2014
 
Point of Contact
Joe Wilson, Phone: 720-963-3090, Jason J Longshore, Phone: 7209633090
 
E-Mail Address
cflcontracts@dot.gov, jason.longshore@dot.gov
(cflcontracts@dot.gov, jason.longshore@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Cross Sections T36 - T71 Plan Sheets T1 - T35 Plan Sheets F & G Sheets D & E Plan Sheets C32 - C63 Plan Sheets C1 - C31 Plan Sheets A & B Plan Sheets Retaining Wall and Pavement Design Report Invitation for Bid PROJECT DESCRIPTION: The project will improve approximately 17 miles of FH 249 in the Apache-Sitgreaves National Forest within the jurisdiction of Apache County Arizona. The scope of this project includes paving over existing graded surface; minor widening to accommodate the pavement in limited areas; guardrail, drainage work, signing, striping and minor wall construction. The intent of the project is to bring a gravel roadway up to a higher standard for all weather availability via a paved surface from beginning to end. The route will make this are of the forest fully compatible with the other roadways and roadway improvements in the forest on either end. The project improvements start at the intersection of Arizona State Road 273 and proceeds easterly for approximately 17 miles to US 191 about 2 miles north of the town of Alpine, Arizona. SIGNIFICANT QUANTITIES: o Schedule A - Major Items o Excavation (28,500 cubic yards) o Superpave Pavement (51,100 tons) o Earthwork Waste (13,000 cubic yards) o MSE Wall (5,900 square yards) o Rolled Erosion Control (22,700 square yards) o Concrete Barrier (1,550 linear feet) o Topsoil (12,000 cubic yards) IMPORTANT REQUIREMENT: The project will span two construction seasons. The route is currently closed during the winter season except about a 3 mile stretch on the east end that provides access to a winter tubing hill. Access to the sites through the winter months is limited and a full closure (winter shutdown) is anticipated. ENGINEER'S ESTIMATE: Estimated Construction Cost Range for Schedule A is around $15 million. CONSTRUCTION DURATION: Tentative construction duration is from May 2014 through October 2014 and March 2015 through June 2015.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-14-B-00006/listing.html)
 
Place of Performance
Address: Apache-Sitgreaves National Forest, Alpine, Arizona, 85920, United States
Zip Code: 85920
 
Record
SN03341077-W 20140419/140417234509-8b4ddacb3160d89d8b3d6340eb43e85a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.