Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 18, 2014 FBO #4528
SOLICITATION NOTICE

F -- Palouse Mulching - Project_Map_Palouse_Mulching

Notice Date
4/16/2014
 
Notice Type
Presolicitation
 
NAICS
115310 — Support Activities for Forestry
 
Contracting Office
Department of Agriculture, Forest Service, R-1 IMAT: Clearwater; Idaho Panhandle; Kootenai; and Nez Perce NF's, 3815 Schreiber Way, Coeur d'Alene, Idaho, 83815-8363, United States
 
ZIP Code
83815-8363
 
Solicitation Number
AG-02RC-S-14-0044
 
Point of Contact
Darren M. Zychek, Phone: 2084768224
 
E-Mail Address
dzychek@fs.fed.us
(dzychek@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Project_Map_Palouse_Mulching It is the objective of this contract to obtain high quality services to ensure adequate fuel reduction across the site. The Contractor shall perform this work in compliance with all terms, specifications, and provisions of this Contract. The Contractor shall furnish all labor, equipment, supervision, transportation, supplies (except those designated as Government-furnished), and incidentals necessary to perform fuel reduction services on the designated areas. The project consists of fuel reduction using machinery with mulching capabilities on the Palouse Ranger District of the Clearwater National Forest. Cherry Pit Mulching - From Deary drive east on state highway 8 for 4.8 miles drive through the small community of Helmer and turn right on county road Forks Road. Travel east on Forks road for 0.6 miles to the National Forest boundary and the location of the project area. Avon Mulching - From Deary drive west on state highway 8 for 0.4 miles turn right (north) onto state highway 9. Drive north on state highway 9 for 2.4 miles, turn right onto county road Mica Mountain road. Drive north on Mica Mountain road for 1.6 miles, turn right onto Forest Road 3347. Drive east on Forest Road 3347 for 1.4 miles and turn right onto Forest Road 4707. Drive 2.4 miles on seasonally gated road 4707 for 2.4 miles to project area. Refer to the map attached to this contract for additional directions into the units. Units are flagged in with pink flagging. (a) Subitem 1.1: Cherry Pit Unit 14 (45 acres). All acres within the marked boundaries of the unit meeting slope limitations for equipment will be machine masticated or mulched. These units will not be planted after fuel treatment is complete. (b) Subitem 1.2: Avon (35 acres). All acres within the marked boundaries of the unit meeting slope limitations for equipment will be machine masticated or mulched. These units will not be planted after fuel treatment is complete.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/281/AG-02RC-S-14-0044/listing.html)
 
Place of Performance
Address: Deary Idaho, Latah County, Deary, Idaho, United States
 
Record
SN03340574-W 20140418/140416235326-02069f850e38d9207438d388fa695df2 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.