Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 12, 2014 FBO #4522
SOLICITATION NOTICE

66 -- CMBRE System and all associated cables

Notice Date
4/10/2014
 
Notice Type
Presolicitation
 
NAICS
334515 — Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, PK/PZ - Robins AFB, 215 Page Rd, Robins AFB, Georgia, 31098-1611, United States
 
ZIP Code
31098-1611
 
Solicitation Number
FA8532-14-R-30404
 
Point of Contact
Meghan A. Cherry, Phone: (478)222-7350, Tara S Odom, Phone: (478)222-1943
 
E-Mail Address
meghan.cherry@us.af.mil, Tara.Odom@us.af.mil
(meghan.cherry@us.af.mil, Tara.Odom@us.af.mil)
 
Small Business Set-Aside
N/A
 
Description
ITEM: CMBRE System and all associated cables The CMBRE System is a joint service tester with adapters used to initiate munitions built-in-test (BIT), provide munitions BIT status, and reprogram munitions. The CMBRE system is composed of the CMBRE Plus along with ADU-890 and ADU-891 adapter units, and all associated cables. Specifically, the CMBRE Plus consists of three cases: a) Test Adapter Unit (TAU) case; b) Controller Unit Test Set case; and, c) the CMBRE Accessory Kit case. In addition, the ADU-891 consists of two cases: one case houses a switchbox and munitions unique interface cables and the other case holds the remaining munitions unique interface cables. The ADU-890 is a single case containing a switchbox and the munitions unique interface cables. Materials are steel, aluminum, rubber and plastic. The requirement is for the basic year and four (4) 12 month Option Periods. The quantities are based on best estimated quantities (BEQ). AN/GYQ-79A CMBRE Plus- Basis through Option Period IV, BEQ 15 EA N SN: 6625-01-535-4586KV P/N 3000112 Length: 22 IN, Width: 15 IN, Height: 18 IN, Weight: 46 LB ADU-890/E- Basis through Option Period IV, BEQ 15 EA NSN: 6625-01-533-0798KV P/N 3005095 Length: 19 IN, Width: 19 IN, Height: 16 IN, Weight: 38 LB ADU-891(V)1/E- Basis through Option Period IV, BEQ 20 EA NSN: 6625-01-543-8090KV P/N 3005537-1 Length: 18.5 IN, Width: 18.5 IN, Height: 18.5 IN, Weight: 46 LB ADU-891(V)3/E- Basis through Option Period IV, BEQ 5 EA NSN: 6625-01-561-0677KV P/N 3005537-3 Length: 18.5 IN, Width: 18.5 IN, Height: 18.5 IN, Weight: 46 LB CMBRE Initial Spares Kit- Basis through Option Period IV, BEQ 10 EA P/N 3007862 ADU-891 Conversion Kit (V3) to (V1)- Basis through Option Period IV, BEQ 5 EA P/N 3005537RF-3 Cables of Various lengths W1 CMBRE Cable- Basis through Option Period IV, BEQ 8 EA NSN: 5995-01-458-7040 KV P/N 3000180 W2 CMBRE Cable- Basis through Option Period IV, BEQ 4 EA P/N 3004798 W3 CMBRE Cable- Basis through Option Period IV, BEQ 4 EA P/N 3004799 W4 CMBRE Cable- Basis through Option Period IV, BEQ 8 EA NSN: 6150-01-458-7813KV P/N 3000181 W5 CMBRE Cable- Basis through Option Period IV, BEQ 4 EA NSN: 6150-01-462-5395SX P/N 3000184 W6 CMBRE Cable- Basis through Option Period IV, BEQ 8 EA P/N 3004743 W14 CMBRE MMSI Cable- Basis through Option Period IV, BEQ 4 EA P/N 3003876 W15 AIM-120 Cable- Basis through Option Period IV, BEQ 3 EA P/N 3005865 W16 AIM-120 Cable- Basis through Option Period IV, BEQ 4 EA P/N 3006045 W17 AIM-120 Cable- Basis through Option Period IV, BEQ 3 EA P/N 3006046 W17 AIM-120 Cable (in container) - Basis, Option Period I, II and IV, BEQ 110 EA; Option Period III, BEQ 290 EA NSN: 6150-01-553-6525AL P/N 3006046-2 W18 AIM-120 Cable- Basis through Option Period IV, BEQ 3 EA P/N 3005907 W19 AIM-120 Cable- Basis through Option Period IV, BEQ 4 EA P/N 3006047 W9 AIM-9X Cable- Basis through Option Period IV, BEQ 3 EA P/N 3006094-2 W10 AIM-9X Cable- Basis through Option Period IV, BEQ 3 EA P/N 3000844-2 W11 AIM-9X Cable- Basis through Option Period IV, BEQ 3 EA P/N 3000845-2 W12 AIM-9X Cable- Basis through Option Period IV, BEQ 4 EA P/N 3006150 W13 AIM-9X Cable- Basis through Option Period IV, BEQ 3 EA NSN: 6150-01-487-6624AB P/N 3000847-2 W20 BRU-61 Cable- Basis through Option Period IV, BEQ 3 EA P/N 3005094 W21 SDB 4 Head Cable- Basis through Option Period IV, BEQ 3 EA P/N 3005096 W23 JDAM Cable- Basis through Option Period IV, BEQ 8 EA NSN: 6150-01-557-2538KV P/N 3007008 Requirements can be exercised for Air Force (USAF), DoD, or FMS requirements. DELIVERY: Place of delivery is to be determined (TBD). Delivery for each item is as follows: AN/GYQ-79A CMBRE Plus- 365 days ARO ADU-890/E- 365 days ARO ADU-891(V)1/E- 365 days ARO ADU-891(V)3/E- 365 days ARO CMBRE Initial Spares Kit- 120 days ARO ADU-891 Conversion Kit (V3) to (V1) - 120 days ARO The Government's required delivery for W-17 cables in the basic and option periods is the first 20 units on a delivery order shall be delivered no later than 180 days after the effective date of the delivery order. The Government's required delivery for all CMBRE cables (W1, W2, W3, W4, W5, W6, W9, W10, W11, W12, W13, W14, W15, W16, W17, W18, W19, W20, W21, W23) except the W-17 cable in the basic and option periods is the first 20 units of any combination of cables on a delivery order shall be delivered no later than 120 days after the effective date of the delivery order. If the cables identified on a delivery order exceed 20, the contractor shall deliver the cables at a rate of 20 units per 30-day period until such time that the ordered quantity is completely delivered. Each delivery order will identify a specific delivery due date for the units that are in that order. T he approximate RFP issue date will be April 25, 2014; proposals will be due Monday, May 27 th, 2014. The RFP will be posted to the Federal Business Opportunities (FBO) website. Electronic procedures will be used for this solicitation at www.fedbizopps.gov only. NO TELEPHONE REQUESTS WILL BE HONORED and no hard copies will be mailed out. This is a sole source requirement that will be purchased from Alliant Techsystems Operations, LLC, CAGE: 06424 in accordance with FAR 6.302-1, Only Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. All responsible sources may submit a capability statement, proposal, or quotation which shall be considered by the agency. All questions regarding the RFP must be submitted in writing to Meghan.Cherry@us.af.mil with copy to Tara.Odom@us.af.mil. NO TELEPHONE QUESTIONS WILL BE ACCEPTED.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/WRALC/FA8532-14-R-30404/listing.html)
 
Record
SN03335152-W 20140412/140410234649-7f3451c4c36bb1ef4d2ee172d976784b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.