Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 09, 2014 FBO #4519
MODIFICATION

Y -- Shingle Creek Crossing

Notice Date
4/7/2014
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-4 Utah Acquisition Support Center, 2222 West 2300 South, Salt Lake City, Utah, 84119, United States
 
ZIP Code
84119
 
Solicitation Number
AG-84N8-S-14-0046
 
Point of Contact
Tamera Draper, Phone: 801.975.3370, Garon Sandall, Phone: 435-896-1065
 
E-Mail Address
tdraper01@fs.fed.us, gsandall@fs.fed.us
(tdraper01@fs.fed.us, gsandall@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Presolicitation Notice (posted April 7, 2014) Shingle Creek Crossing Fishlake National Forest - Beaver Ranger District The work consists of relocating approximately 0.15 miles of Forest Road #114 to a new location to cross Shingle Creek. Installation of 27' of 18'-2" x 4'-7" aluminum box culvert with aluminum wingwalls, headwalls and concrete footings is necessary. Work will include installation of 81" x 59" CMP and another 28" x 20" CMP. Two hardened low water crossings are required. Several instream rock crossvanes are incorporated into the project as well as other associated minor work. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and shall perform all work required to complete the project as shown on the plans, shown on the manufacturer's shop drawings, and as described in the Standard Specifications (FP-03) and Forest Service Supplemental Specifications (FSSS). Water sources are not designated, the Contractor is responsible for furnishing water from sources other than from National Forest lands. During construction, the existing road Shingle Creek Road, Forest Road Number 114 will need to be maintained to allow traffic to continue utilizing the road. Estimated start date: June 16, 2014 Contract Time: 50 days Wage Determinations will apply to this project It is anticipated that the actual solicitation for this project will be posted on or around April 23, 2014. The entire solicitation package along with project drawings, schedule of items and specifications will be posted at that time.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/84N8/AG-84N8-S-14-0046/listing.html)
 
Place of Performance
Address: The project is located on the Fishlake National Forest, Beaver Ranger District., The project road may be accessed by exiting off I-70 at Exit # 7, 7 miles East of the I-70, I-15 interchange in the Clear Creek Canyon. From there head east on County Road #2524, Clear Creek Canyon Road, approximately 1.75 miles to the Shingle Creek Road turn off. The project is located approximately 1 mile south from the turn off along this road., Beaver, Utah, 84713, United States
Zip Code: 84713
 
Record
SN03331277-W 20140409/140407233947-ffe6d514456fdd0015a67b6c52d5adb7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.