Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 20, 2014 FBO #4499
SOLICITATION NOTICE

56 -- Install Floor Matting System - Package #1

Notice Date
3/18/2014
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238330 — Flooring Contractors
 
Contracting Office
Department of the Navy, Naval Facilities Engineering Command, NAVFAC Midwest, 201 Decatur Avenue, Building 1A, Great Lakes, Illinois, 60088-5600
 
ZIP Code
60088-5600
 
Solicitation Number
N4008314Q3211
 
Archive Date
5/3/2014
 
Point of Contact
Joe Loerschh, Phone: 847-688-5395 x253
 
E-Mail Address
joseph.loersch@navy.mil
(joseph.loersch@navy.mil)
 
Small Business Set-Aside
N/A
 
Description
N40083-14-Q-3211 RFQ This RFQ is for a small business set-aside. NAICS code 238330 with a size standard of $14,000,000.00 The estimated range of this project is $25,000 - $100,000. If you are interested in attending the site visit please contact Mr. Joe Loersch no later than March 31st, 2014. Provide a multipurpose floor system comprised of a rubber base mat laid in adhesive and a two-component polyurethane surface that is field applied in a seamless monolithic application. This floor system shall be intended for use and stand up to use in areas such as gymnasiums and weight training rooms. Furnish the following using standard design, materials, construction sizes and colors: •- Install new Synthetic Floor system •- Prep the existing floor for new floor installation (NOTE: Existing floor shall be demolished down to the concrete substrate and cove base will be removed by NAVFAC PWDGL shop forces) •- Adhere recycled Rubber base mat 9mm thick with 2mm Top coat •- Apply High Strength Resin •- Provide reducers where new flooring meets existing flooring (i.e.VCT or Carpet Tile) •- Note: Plastic Dustproof walls with Z flaps will be provided by NAVFAC PWDGL shop forces. Also, new cove base will be installed once new monolithic floor is complete and cured by NAVFAC PWDGL Shop forces •- Color selection of floor by Government •- All products used shall be "VOC" compliant and no personnel shall be required to evacuate the facility during installation of any product due to inhalation or fume dangers Four days floor prep One Week Installation Approx. (1) Week Cure time
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N68950/N4008314Q3211/listing.html)
 
Record
SN03313809-W 20140320/140318235157-ce514710fa1ee50242f6461a8a225a39 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.