AWARD
45 -- HVAC Repair in NAG Bldg. 207 (Server Room) Kirtland AFB, NM.
- Notice Date
- 1/24/2014
- Notice Type
- Award Notice
- NAICS
- 238220
— Plumbing, Heating, and Air-Conditioning Contractors
- Contracting Office
- USACE District, Albuquerque, CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, NM 87109-3435
- ZIP Code
- 87109-3435
- Solicitation Number
- W912PP14P0006
- Archive Date
- 2/23/2014
- Point of Contact
- Glenda Kohlieber, 575-556-9940
- E-Mail Address
-
USACE District, Albuquerque
(glenda.d.kohlieber@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912PP14P0006
- Award Date
- 1/9/2014
- Awardee
- ORTEGA PLUMBING AND HEATING INC (615720880) <br> 38 HACIENDA DEL VALLE <br> PERALTA, NM 87042-8506
- Award Amount
- $71,464.78
- Line Number
- 0001
- Description
- This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 20451 National Assessment Group (NAG) HVAC Work in Server Room 207. The work shall include the following requirements listed in the specific requirements. The contractor shall assure the attached checklist and DD Form 1354 are completed and submitted to USACE and Kirtland AFB Reap Property office to get it staffed to the BCE for signature, at the conclusion of the project. SPECIFIC REQUIREMENTS: Contractor shall provide and install two Daikin Sky air Cooling only systems for the Server Room.Equipment provided will be 2 sky air condensers (cooling only) 2 round flow fan coil cassettes.Condensers will be located on north wall with standard concrete housekeeping pads. Electrical service is 208/230 and will be ran from north wall on the exterior of building. Controls will be remote navigation controllers. Install a 1 touch manager system that will be used for the Server Room HVAC system. Provide a factory start up and Training for Facility personnel.Continue the existing west wall up to the deck above to have a sealed conditioned space. Provide a Nortec Humidifier with remote mounted blower pack.Controls for the Nortec will be a wall mounted humidistat with digital display. Testing and balancing of the space will be required.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP14P0006.html)
- Record
- SN03274147-W 20140126/140124234353-c854094c371ec5300de23d5fba4e61cc (fbodaily.com)