Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 26, 2014 FBO #4446
AWARD

45 -- HVAC Repair NAG Bldg 20451 Rooms 205,210, 211 &212, Kirtland AFB, NM.

Notice Date
1/24/2014
 
Notice Type
Award Notice
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
USACE District, Albuquerque, CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, NM 87109-3435
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP14P0009
 
Archive Date
2/23/2014
 
Point of Contact
Glenda Kohlieber, 575-556-9940
 
E-Mail Address
USACE District, Albuquerque
(glenda.d.kohlieber@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PP14P0009
 
Award Date
1/22/2014
 
Awardee
ORTEGA PLUMBING AND HEATING INC (615720880) <br> 38 HACIENDA DEL VALLE <br> PERALTA, NM 87042-8506
 
Award Amount
$106,062.93
 
Line Number
0001
 
Description
This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 20451 National Assessment Group (NAG) HVAC Work in Rooms 205, 210, 211, 212. The work shall include the following requirements listed in the specific requirements. The contractor shall assure the attached checklist and DD Form 1354 are completed and submitted to USACE and Kirtland AFB Reap Property office to get it staffed to the BCE for signature, at the conclusion of the project. SPECIFIC REQUIREMENTS: Contractor to Install 1 complete VRV-III heating and Cooling System. Equipment provided will be 1 Heat Recovery VRV Condenser 230 volt. Contractor shall install 8 round flow ceiling mounted heat pump cassettes. Contractor shall install 1 VAM energy recovery ventilator to be located in mechanical room. Contractor shall install all refrigerant lines, condensate lines, control wiring and 4 Navigation Remote Controllers. Condenser will be located on north wall on a standard concrete housekeeping pad. All electrical needed for a complete system. Testing and balance will not be required.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP14P0009.html)
 
Record
SN03274127-W 20140126/140124234341-1c4ff1d47f7e1816a63c9a28750a06e0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.