Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 15, 2014 FBO #4435
SOLICITATION NOTICE

66 -- ISS Beamline High Heat Load Monochromator PAckage - RFP PB260278

Notice Date
1/13/2014
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
335999 — All Other Miscellaneous Electrical Equipment and Component Manufacturing
 
Contracting Office
Department of Energy, Brookhaven National Laboratory (DOE Contractor), Brookhaven, PO Box 5000, Bldg. No. 355, Upton, New York, 11973
 
ZIP Code
11973
 
Solicitation Number
PB260278
 
Archive Date
2/7/2014
 
Point of Contact
Philip Bernath, Phone: 6313443947
 
E-Mail Address
pbernath@bnl.gov
(pbernath@bnl.gov)
 
Small Business Set-Aside
N/A
 
Description
Enclosure 4 Pricing Sheet Enclosure 3 AMS Form-010 Enclosure 2 AMS Form-009 Attachment (H) Patent Information Sheet Attachment (G)Sample Subcontracting Plan Attachment (F)Contractor Health and Safety Plan Checklist; dated September 11, 2013 Attachment (E)Patent Certification; AMS Form 032 (Revision 0, dated June 2006) Attachment (D) BNL Supplier Quality Assurance Requirement (BNL-QA-101), dated August 2013 Attachment (C19) NSLS-II, Health and Safety Plan Template, PS-C-ESH-002, Revision 3, Effective June 1, 2012 Attachment (C18) NSLS-II Environment, Safety and Health Plan for Technical Equipment Installation, LT-ESH-0021, Version 1.1, dated December 2009 Attachment (C17) NSLS-II Nomenclature Standard, LT-ENG-RSI-STD-002, Revision 2, dated 1/31/2009 Attachment (C16) Vacuum Systems Consensus Guideline for Department of Energy Accelerator Laboratories, BNL-81715-2008-IR, dated September 9,2008 Attachment (C15) Valve, All Metal Gate, DN160, PI-VLV-0033, Rev. A, dated 9/2013 Attachment (C14) Valve, All Metal Gate, DN160, PI-VLV-0065, Rev. A, dated 9/2013 Attachment (C13) ISS Beamline, Vacuum, Pumps Pump, Ion, 200 L/S 8.00 CF Single, PD-ISS-VA-PMP-0002, Rev. A, dated 10/2013 Attachment (C12) ISS Beamline Hutch 8-ID-A Assembly, PD-ISS-HU-1000, Rev. A, dated 1/2013 Attachment (C11) ISS Beamline Hutch Layout, PD-ISS-HU-2000, Rev. A, dated 11/2013 Attachment (C10) High Heat Mono Support, Granite, PD-ISS-HHM-5000, Rev. A, dated 1/2013 Attachment (C9) High Heat Mono HHM, Location Interface, PD-ISS-HHM-1100, Rev. A, dated 11/2013 Attachment (C8) High Heat Mono HHM, Overview, PD-ISS-HHM-1000, Rev. A dated 11/2013 Attachment (C7)ISS Beamline Ray Tracing Layout, PD-ISS-RAYT-0001, Rev. 1, dated 05/3/2013 Attachment (C6) Requirements, Specifications, and list of interfaces for the Insertion Devices and Front Ends for the NEXT Project Beamlines, NX-C-XFD-RSI-001, Version 3, dated 31 May 2013 Attachment (C5)Requirements for Design and Fabrication of Components for NSLS-II UHV Systems, Attachment (C4)Beamline Coordinate System Standards LT-C-XFD-STD-BL-COORD-001 Revision 2 Dated April 2012 Attachment (C3)Standard Technical Specifications for NSLS II Beamline Components LT-C-XFD- SPC-COM-001 Version 3, Dated September 17, 2013 Attachment (C2)Beamline Systems Instrumentation Interfacing Standard, LT-C-XFD-SPC-CO-IIS-001, Rev. 4, dated August 2012 Attachment (C1) Experimental Facilities Requirements,Specifications, and Interfaces for the Controls and Data Acquisition Systems, LT-C-XFD-RSI-CO-001, Version 2, dated April 2012 Attachment (B)NSLS-II ISS Beamline High Heat Load Monochromator Package Technical Specification, NX-C-SPC-ISS-PHH-001, Version 2, dated December 10, 2013 Attachment (A)NSLS-II ISS Beamline High Heat Load Monochromator Package, NX-C-SOW-ISS-PHH-001, Statement of Work, Version 1, dated December 03, 2013 Enclosure 1 - Draft Contract 260278 RFP 260278 Brookhaven Science Associates, LLC (BSA), under Contract DE-AC02-98CH10886 for the operation of Brookhaven National Laboratory (BNL) with the U.S. Department of Energy (DOE), herewith solicits your proposal for the ISS High Heat Load Monochromator Package at the NSLS-II at Brookhaven National Laboratory. The NSLS-II project includes the design, construction, installation, and commissioning of accelerator hardware, civil construction, and central facilities required to produce a new synchrotron light source. The project includes a highly optimized 3 GeV electron storage ring, full-energy injector, experimental beamlines and optics, and appropriate support equipment. This requirement is for the ISS Beamline High Heat Load Monochromator Package at the NSLS-II at Brookhaven National Laboratory.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/BHL/BNL/PB260278/listing.html)
 
Place of Performance
Address: Brookhaven National Laboratory, Upton, New York, 11973, United States
Zip Code: 11973
 
Record
SN03266350-W 20140115/140113235612-77a05e7228c0ea9f6068fb0cdf298012 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.