SOLICITATION NOTICE

Y -- Northern Electrical Power System (NEPS) Phase I Re-Award, Afghanistan

Notice Date
12/23/2013
 
Notice Type
Presolicitation
 
NAICS
237130 — Power and Communication Line and Related Structures Construction
 
Contracting Office
USACE Middle East District, P.O. Box 2250, Winchester, VA 22604-1450
 
ZIP Code
22604-1450
 
Solicitation Number
W912ER-14-R-0012
 
Response Due
1/6/2014
 
Archive Date
2/21/2014
 
Point of Contact
Jason Dalton, 5406655341
 
E-Mail Address
USACE Middle East District
(jason.dalton@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
1. CONTRACT INFORMATION: This announcement is for the purpose of soliciting contractors interested in submitting a proposal for the Two-Phase Design-Build Northern Electrical Power System (NEPS) in Afghanistan. The Transatlantic Division, Middle East District (TAM), US Army Corps of Engineers (USACE) intends on awarding a Firm Fixed Price (FFP) design-build contract that will expand the high voltage power system from the from the Argendeh Substation site in Kabul Province to the Pul-e Alam Substation in the Logar Province, Afghanistan in Afghanistan as specified herein. This is a Two-Phased solicitation process. For Phase One of the Two-Phase Design-Build selection procedure, offerors will be required to submit Experience (Factor 1) and Past Performance (Factor 2) information on relevant projects to be described in the RFP. Offerors will also be required to submit a narrative describing their Technical Approach (Factor 3) to completing the work required under this RFP. Price proposals are not to be submitted under Phase 1. Only the top four (4) proposals will be selected to proceed to Phase Two of the evaluation process. For Phase 2 of the Two-Phase Design-Build selection procedure For Phase 2 of the Two-Phase Design-Build selection procedure, offerors will be required to submit their Milestone Schedule (Factor 1), Key Personnel (Factor 2), and Price (factor 3). ***SECURITY ON THIS PROJECT WILL BE FIXED-PRICE*** Offerors should note that the use of the term quote mark Phase I quote mark in the title of this solicitation relates to the phased construction of power systems in Afghanistan; and not the procurement strategy of a two phase selection procedure. If your company is interested in receiving a copy of the solicitation please send an email to Mr. Jason Dalton at Jason.Dalton@usace.army.mil and MAJ Dachelle D. Banks at Dachelle.d.banks@usace.army.mil confirming your interest. Your email message should only state that you would like to receive a copy of the solicitation and an email address for communication. Upon receipt of your email your company will be added to the Bidder's List. It is anticipated that the RFP for this project will be released on 29 January 2014; however this is subject to change. In order to be eligible for award offerors must be able to do business in Afghanistan and cannot be on the Federal Debarment List. Contracting Office Address: USACE Middle East District, P.O. Box 2250, Winchester, VA 22604-1450 Place of Performance: USACE Middle East District P.O. Box 2250, Winchester VA 22604-1450 US Point of Contact(s): Jason Dalton, 540-665-5341 MAJ Dachelle D. Banks 540-665-2659
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA78/W912ER-14-R-0012/listing.html)
 
Place of Performance
Address: USACE Middle East District P.O. Box 2250, Winchester VA
Zip Code: 22604-1450
 
Record
SN03257512-W 20131225/131223235016-7d5af9992d735cb3c59fde6aec8cdf33 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers