Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 09, 2013 FBO #4337
SOLICITATION NOTICE

10 -- PISTOL BARREL

Notice Date
10/7/2013
 
Notice Type
Presolicitation
 
NAICS
332994 — Small Arms, Ordnance, and Ordnance Accessories Manufacturing
 
Contracting Office
Defense Logistics Agency, DLA Acquisition Locations, DLA Land and Maritime, P O Box 3990, Columbus, Ohio, 43218-3990, United States
 
ZIP Code
43218-3990
 
Solicitation Number
SPE7L413R0018
 
Archive Date
12/6/2013
 
Point of Contact
Michele Beasley, Phone: 6146927572
 
E-Mail Address
michele.beasley@dla.mil
(michele.beasley@dla.mil)
 
Small Business Set-Aside
N/A
 
Description
NSN# 1005-01-204-4337 4200 EA. (8400 W/100% OPTION) OPEN/CLOSE: 10/22/13 - 11/21/13 **************************************************** BARREL, PISTOL. DLAD PROVISION 52.211-9009 IS APPLICABLE TO THIS SOLICITATION, THEREFORE SURPLUS MATERIAL WILL NOT BE CONSIDERED. IF PRESENT IN THE SOLICITATION, PROVISION 52.211-9003 AND CLAUSE 52.211-9000 ARE NOT APPLICABLE. THIS ITEM IS A "DEFENSE ARTICLE" AS DEFINED IN AND SUBJECT TO THE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (22 C.F.R. 120-30) AND THE ARMS EXPORT CONTROL ACT (22 U.S.C.A. 2778-2799). ANY MANUFACTURER OR EXPORTER OF DEFENSE ARTICLES IS REQUIRED TO REGISTER WITH THE DIRECTORATE OF DEFENSE TRADE CONTROLS (DDTC), DEPARTMENT OF STATE. DOCUMENTARY EVIDENCE OF REGISTRATION MAY BE REQUIRED PRIOR TO AWARD. ADDITIONAL EXPORT RESTRICTIONS APPLY AS INDICATED HEREIN. FAILURE TO SUBMIT DDTC REGISTRATION WHEN REQUESTED WILL MAKE A QUOTE/OFFER INELIGIBLE FOR AWARD. PER DRAWING 9346425/13012977 REQUIRE SUPPLIMENTAL OIL TREATMENT PER MIL-C-16173, GR 3,FOR PHOSPHATE PROCESS. *********************** EXCEPTIONS ********************* MIL-DTL-16232, para 6.2.1- DD FORM 1423 is replaced by SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP) PHOS-DL-MANG IF DRAWING NOTE GIVES OPTION FOR ZINC OR MANGANESE COATING THEN MANGANESE IS REQUIRED. SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP) PHOS-DL-MANG, PARAGRAPH 3: REPLACE, "ADDITIONAL '30' DAYS WILL BE REQUIRED FOR REVIEW/APPROVAL DETERMINATION", WITH "ADDITIONAL '45' DAYS WILL BE REQUIRED FOR REVIEW/ APPROVAL DETERMINATION. Note 15 dwg: 9346426 (19200) should read as: "AFTER PROOF FIRING, THE HIGH PRESSURE TEST CARTRIDGE CASE SHALL BE VISUALLY EXAMINED FOR BULGES, SPLITS, RINGS, AND OTHER DEFECTS CAUSED BY A DEFECTIVE BARREL. ADDITIONALLY, EACH BARREL SHALL BE MAGNETIC PARTICLE INSPECTED IN ACCORDANCE WITH ASTM E1444. USE CIRCULAR AND LONGITUDINAL MAGNETIZATION, WET METHOD OF PARTICLE APPLICATION WITH WET FLOURESCENT TYPE PARTICLES. PRESENCE OF CRACKS, SEAMS, OR OTHER INJURIOUS DEFECTS SHALL BE CAUSE FOR REJECTION." ******************* END OF EXCEPTIONS ****************** ************ SPECIAL GFE AND GFM REQUIREMENTS ********** THIS ITEM REQUIRES GOVERNMENT FURNISHED EQUIPMENT (GFE) AND GOVERNMENT FURNISHED MATERIAL (GFM). SEE BELOW FOR SPECIAL CONTRACT REQUIREMENTS:,,A. EQUIPMENT AND MATERIAL REQUIRED FOR CONTRACTOR'S USE;,,,,1. 1 EACH - M9 PISTOL - NSN 1005-01-118-2640.,,,,2. 1 ROUND EACH PER BARREL ON CONTRACT - M905 HIGH PRESSURE CARTRIDGE, DODIC: A364 - NSN 1305-01-173-2397.,,B. A security preaward survey is required for these items. DFARS, Part 252.223-7007, "Safeguarding Sensitive Conventional Arms, Ammunition, and Explosives," shall be part of the solicitation/contract.,,C. This contract involves HAZARDOUS MATERIAL. DFARS 252.223.7002, Safety Precautions for Ammunition and Explosives, DFARS 252.223.370-4, PGI 223.370-4(1)(iv), Safety Precautions for Ammunition and Explosives - PREAWARD SURVEY, and DFARS 252.223.370-4, PGI 223.370-4(1)(iii), Disposal of Remaining GFM Ammunition and Explosives Following Contract Completion or Termination Instructions, shall be part of the solicitation/contract. ******** END SPECIAL GFE AND GFM REQUIREMENTS ******** THE ITEM BEING PROCURED IS A CRITICAL GUN PART ITEM WITH UNIQUE REQUIREMENTS. CONTRACTOR FAT APPLIES. PER FAR 52.209-3: (a) THE CONTRACTOR SHALL TEST 5 UNIT(S)... AT LEAST 10 CALENDAR DAYS BEFORE THE BEGINNING OF FIRST ARTICLE TESTING, THE CONTRACTOR SHALL NOTIFY... (b) THE CONTRACTOR SHALL SUBMIT THE FAT REPORT WITHIN 90 CALENDAR DAYS...(NOTE: THE DELIVERY SCHEDULE ON THE FACE OF THE SOLICITATION REFLECTS ONLY THE TIME TO DELIVER THE SUPPLIES.) WITHIN 45 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE FIRST ARTICLE THE CONTRACTING OFFICER SHALL NOTIFY... PER DLAD 52.209-9017, ALT III DISPOSITION OF FIRST ARTICLES: SEE FAR 52.209-3 (e), THE CONTRACTOR MAY DELIVER THE APPROVED FIRST ARTICLE AS PART OF THE CONTRACT QUANTITY... AFTER RECEIPT OF QUOTES, OFFERORS MAY BE CONTACTED TO PRICE THE FAT REQUIREMENT. PROCESS PROCEDURES AND OR WORKMANSHIP SPECIMENS REQUIRED BY MILITARY SPECIFICATION (S) APPLICABLE TO THIS CONTRACT WILL BE APPROVED BY THE CONTRACT POST AWARD CONTRACTING OFFICER (PCO). POST AWARD PREPRODUCTION APPROVAL VERIFYING THE REQUIREMENTS OF MIL-DTL-16232 IS REQUIRED. A CONTRACT DATA REQUIREMENTS LIST (CDRL), IDENTIFIED IN A SQAP AS A PHOS-DL-MANG AND A SUGGESTED OUTLINE, IDENTIFIED IN A SQAP AS PHOS- OUTLINE-16232, PROVIDE THE PHOSPHATE COATING PROCEDURE REQUIREMENTS/FORMAT AND ARE INCLUDED IN THE TECHNICAL DATA PACKAGE. THE CONTRACTOR MUST PROVIDE COPIES OF PHOSPHATE COATING PROCEDURES WRITTEN SPECIFICALLY FOR THE COATING OF PARTS ON THIS CONTRACT TO THE PCO WITHIN 45 DAY AFTER AWARD. AN ADDITIONAL 45 DAYS WILL BE REQUIRED FOR REVIEW/APPROVAL DETERMINATION. PRODUCT INSPECTION WILL BE CONDUCTED BY THE DCMA QAR AT THE ACTUAL MANUFACTURER'S FACILITY AND IN PROCESS INSPECTIONS WILL OCCUR AT THE PHOSPHATE CONTRACTOR'S FACILITY IDENTIFIED ON THIS CONTRACT. THE IDENTIFICATION OF THE ACTUAL MANUFACTURER AND PHOSPHATE CONTRACTOR MUST BE SUBMITTED TO THE CONTRACTING OFFICER FOR INCLUSION IN THE AWARD. UPON AWARD, ANY CHANGES TO THE ABOVE MUST BE APPROVED BY THE PCO VIA FORMAL CONTRACT MODIFICATION. A WAIVER FOR THE PHOSPHATE PREPRODUCTION REQUIREMENTS OF MIL-DTL-16232 PARAGRAPH 3.1 CAN BE SUBMITTED. THE DOCUMENTATION REQUIRED FOR EVALUATION OF THIS WAIVER REQUEST MUST INCLUDE: A PHOSPHATE PROCEDURE THAT HAS BEEN REVIEWED AND APPROVED BY THIS PROCURING AGENCY AND A TEST REPORT (GOVERNMENT FIRST ARTICLE OR PRODUCTION VERIFICATION TEST)FROM WITHIN THE LAST YEAR IN WHICH THE PHOSPHATE COATING WAS TESTED AND PASSED (FOR ANY NSN). THIS NSN CONTAINS ONE OR MORE COMPONENTS WHICH MUST MEET QPL/QML SPECIFICATIONS AS IDENTIFIED IN THE TECHNICAL DATA PACKAGE. CLAUSE I09A01 (FAR CLAUSE 52.209-1) QUALIFICATION REQUIREMENTS IS APPLICABLE. THE AWARDEE SHALL PROVIDE QPL/QML COMPONENTS ONLY FROM SOURCES QUALIFIED ON THE APPLICABLE QPL(S)/QML(S). THE IDENTIFICATION OF ALL APPLICABLE QPL/QML SOURCES MUST BE SUBMITTED TO THE CONTRACTING OFFICER FOR EVALUATION PRIOR TO CONTRACT AWARD. PRODUCT VERIFICATION TESTING (PVT) CLAUSE DLAD 52.246-9004 MAY BE INVOKED FOR THE REFERENCED CONTRACT. IF INVOKED, PVT SAMPLES MUST BE INSPECTED, PACKAGED AND MARKED AS REQUIRED IN THE CONTRACT. ONE (1) SAMPLE MAY BE DESTROYED DURING TESTING. PRODUCT VERIFICATION TESTING, IF INVOKED, WILL BE PERFORMED PRIOR TO ACCEPTANCE OF EACH SHIPMENT. THE CONTRACTOR MUST PROVIDE PVT SAMPLES FROM EACH (SUB)CONTRACTOR USED IN THE PRODUCTION OF PARTS ON THIS CONTRACT. FIVE (5) PVT SAMPLES, UNLESS OTHERWISE SPECIFIED, WILL BE REQUIRED TO BE IDENTIFIED TO THOSE (SUB)CONTRACTORS WHEN THEY ARE SENT IN FOR TESTING. CERTIFICATE OF CONFORMANCE IS NOT AUTHORIZED. ********** FAR CLAUSE 52.246-11 APPLIES A QUALITY MANAGEMENT PROGRAM MEETING THE REQUIREMENTS OF ISO 9001:2008 OR THE FOLLOWING TAILORED VERSION OF ISO 9001:2008 IS REQUIRED OR A PROGRAM EQUIVALENT TO THE TAILORED VERSION OF THE ISO 9001:2008 IS REQUIRED. DLA TAILORED HIGHER LEVEL QUALITY CLAUSE FROM ISO 9001:2008 4.2.1 General, Documentation Requirements [b and d only] 4.2.2 Quality manual 4.2.3 Control of documents 4.2.4 Control of records 6.2.2 Competence, training and awareness 6.4 Work environment (if applicable) 7.1 Planning of product realization 7.2.1 Determination of requirements related to the product 7.2.2 Review of the requirements related to product 7.2.3 Customer communication 7.3.7 Control of design and development changes 7.4.1 Purchase Product 7.4.3 Verification of purchased product 7.5.1 Control of production and service provision 7.5.3 Identification and traceability 7.5.4 Customer property (if applicable) 7.5.5 Preservation of product 7.6 Control of monitoring and measuring equipment 8.1a,,General for Measurement, Analysis and Improvement 8.2.2 Internal Audit 8.3 Control of nonconforming product 8.2.4 Monitoring and measurement of product 8.5.2 Corrective action 8.5.3 Preventive action **** DLAD 52.246-9003, MEASURING AND TEST EQUIPMENT, APPLIES. **** CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE USED NOR INCORPORATED IN ANY ITEMS TO BE DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS. SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR APPROVAL UNLESS THEY ARE AUTHORIZED BY THE SPECIFICATION REQUIREMENTS. **** DLAD CLAUSE 52.246-9004,PRODUCT VERIFICATION TESTING,IS HEREBY INCORPORATED,AND MAY BE INVOKED AT THE DISCRETION OF THE PROCUREMENT ACTIVITY. **** THIS ITEM HAS TECHNICAL DATA SOME OR ALL OF WHICH IS SUBJECT TO EXPORT-CONTROL REGULATIONS. DISTRIBUTION OF THE TECHNICAL DATA AND ELIGIBILITY FOR AWARD ARE LIMITED TO THOSE SUPPLIERS QUALIFIED THROUGH JCP CERTIFICATION, OR TO THOSE LICENSED BY EITHER THE DEPARTMENTS OF STATE OR COMMERCE; OR TO FOREIGN SUPPLIERS PURSUANT TO INTERNATIONAL AGREEMENTS. TO APPLY FOR JCP CERTIFICATION, COMPLETE DD FORM 2345, "MILITARY CRITICAL TECHNICAL DATA AGREEMENT," FORM IS AVAILABLE AT THE WORLD WIDE WEB ADDRESS HTTP://WWW.DLIS.DLA.MIL/JCP OR BY WRITING TO: DLA LOGISTICS INFORMATION SERVICE FEDERAL CENTER 74 WASHINGTON AVE., NORTH BATILE CREEK, MI 49017-3084 TO MANUFACTURE THIS ITEM, NON-JCP CERTIFIED SUPPLIERS MUST SUBMIT A CURRENT MANUFACTURING LICENSE AGREEMENT, TECHNICAL ASSISTANCE AGREEMENT, DISTRIBUTION AGREEMENT OR OFF-SHORE PROCUREMENT AGREEMENT APPROVED BY THE DIRECTORATE OF DEFENSE TRADE CONTROLS WITH THE OFFER, UNLESS AN EXEMPTION UNDER THE PROVISIONS OF ITAR SECTION, 125.4 "EXEMPTIONS OF GENERAL APPLICABILITY," AND/OR EAR PART 740 ARE APPLICABLE. NON-JCP CERTIFIED SUPPLIERS SEEKING EXPORT CONTROLLED TECHNICAL DATA ARE REQUIRED TO PROVIDE THE CONTRACTING OFFICER WITH AN APPLICABLE AGREEMENT OR IDENTIFY WHICH ITAR/EAR EXEMPTION APPLIES TO RECEIVE A COPY OF THE EXPORT CONTROLLED TECHNICAL DATA. NOTE: JCP CERTIFIED CONTRACTORS WHO RECEIVE TECHNICAL DATA PURSUANT TO THEIR DD FORM 2345 CERTIFICATION MAY NOT FURTHER DISSEMINATE SUCH DATA UNLESS FURTHER DISSEMINATION OF THE TECHNICAL DATA IS EXPRESSLY PERMITTED BY DODD 5230.25." **** MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL NOT BE INTENTIONALLY ADDED TO,OR COME IN DIRECT CONTACT WITH,ANY HARDWARE OR SUPPLIES FURNISHED UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS; AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA. PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR MERCURY COMPOUND. (IAW NAVSEA 5100-003D). PACKAGING SHALL BE IN ACCORDANCE WITH SPECIAL PACKAGING INSTRUCTION (AM) P9346422. IAW BASIC DRAWING NR 19200 9346422 REVISION NR C DTD 06/09/2011 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19200 12579607 REVISION NR C DTD 08/04/2009 PART PIECE NUMBER: IAW REFERENCE SPEC NR MIL-DTL-16232G NOT 1 REVISION NR G DTD 10/03/2006 PART PIECE NUMBER: IAW REFERENCE UNK QPL-16173-84 NOT 1 REVISION NR 84 DTD 10/03/2006 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19200 L2S3025 REVISION NR E DTD 04/15/2002 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19200 12993884 REVISION NR F DTD 08/15/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19200 9346425 REVISION NR N DTD 06/09/2010 PART PIECE NUMBER: IAW REFERENCE QAP 16236 PHOS-OUTLINE-16232 REVISION NR A DTD 10/15/2010 PART PIECE NUMBER: IAW REFERENCE QAP 16236 PHOS-QAR-CHECK REVISION NR A DTD 10/15/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19200 13012977 REVISION NR B DTD 06/09/2011 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19200 9346422 REVISION NR B DTD 08/09/2001 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19200 9346422 REVISION NR DTD 03/22/2013 PART PIECE NUMBER: IAW REFERENCE QAP 16236 PHOS-DL-MANG REVISION NR DTD 11/05/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19200 9346426 REVISION NR P DTD 06/09/2011 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19200 9346422 REVISION NR C DTD 06/09/2011 PART PIECE NUMBER:
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DLA/J3/DSCC/SPE7L413R0018/listing.html)
 
Record
SN03212843-W 20131009/131007234217-43fda01233a1fbde70f62d01d3875805 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.