AWARD
Z -- AWARD - Boiler MACT, Repair Heat Plants project, Wright Patterson Air Force Base, Ohio
- Notice Date
- 8/23/2013
- Notice Type
- Award Notice
- NAICS
- 238220
— Plumbing, Heating, and Air-Conditioning Contractors
- Contracting Office
- USACE District, Louisville, 600 Dr. Martin Luther King, Jr. Place, Room 821, Louisville, KY 40202-2230
- ZIP Code
- 40202-2230
- Solicitation Number
- W912QR-13-R-0043
- Response Due
- 7/10/2013
- Archive Date
- 9/22/2013
- Point of Contact
- Bjorn, 502-315-6196
- E-Mail Address
-
USACE District, Louisville
(bjorn.t.hale@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912QR-13-C-0023
- Award Date
- 8/22/2013
- Awardee
- WALSH BUTT JOINT VENTURE (968005764) <br> 929 W ADAMS STREET <br> CHICAGO, IL 60607-3021
- Award Amount
- $12,598,778.00
- Line Number
- 0001
- Description
- The proposed project is for the Wright-Patterson AFB BOILER MACT, REPAIR HEAT PLANTS. The construction entails completing a conversion of two Central Heating Plants from Coal to Natural Gas located in Area A and Area B of Wright Patterson AFB, OH. One Plant produces High Temperature Hot Water (HTHW) and the other Plant produces Steam. Work under this contract will consist of the following at each Heating Plant: All modifications required to convert two of the three existing coal-fired HTHW generators/Steam boilers to burn natural gas, provide a new industrial control system for plant processes, provide a new combustion control/burner management system for both the converted coal-fired and existing gas-fired HTHW generators/Steam boilers, and demolition of remaining coal-fired HTHW generator/Steam boiler. The Project also includes the demolition of all coal and ash handling, conveying, and storage equipment including the ash silo, four (4) 550 ton coal storage silos, Crusher and Transfer towers, multiple module Baghouse, Shaker House at each Heating Plant. The existing Heating Plant in Area A consists of three (3) 169 MMBtu/hr stoker type, coal-fired High Temperature Hot Water (HTHW) Generators and one (1) 96 MMBtu/hr gas-fired HTHW Generator. The existing Heating Plant in Area B consists of three (3) 169 MMBtu/hr stoker type, coal-fired High Pressure Steam (HPS) Boilers and two (2) 96 MMBtu/hr gas-fired HPS Boilers. The proposed contract is for meeting the National Emissions Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters (ICIB NSHAP), Boiler Maximum Achievable Controls Technology (MACT) rule emissions limits, established by the USEPA.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA27/W912QR-13-R-0043/listing.html)
- Record
- SN03161322-W 20130825/130824000458-6e8ec3d70bc5dbca208b1d85f720641f (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |