SPECIAL NOTICE
44 -- This is an amendment to Solicitation Number W911N2-13-T-0072 to address the Confined Space Requirement.
- Notice Date
- 8/23/2013
- Notice Type
- Special Notice
- NAICS
- 333413
— Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
- Contracting Office
- ACC-RSA-LEAD - (SPS), ATTN: AMSAM-LE-KO, 1 Overcash Avenue, Bldg 2, Chambersburg, PA 17201-4152
- ZIP Code
- 17201-4152
- Solicitation Number
- W911N213T0072
- Archive Date
- 11/21/2013
- Point of Contact
- ALLEMAN TRUDY, 717-267-5874
- E-Mail Address
-
ACC-RSA-LEAD - (SPS)
(trudy.o.alleman.civ@mail.mil)
- Small Business Set-Aside
- N/A
- Description
- This is an amendment to Solicitation Number W911N2-13-T-0072 combined synopsis/solicitation addressing the following question that was submitted to the Contract Specialist after the site visit: Question for 1.2 SECURITY, SAFETY, AND FIRE PROTECTION Question - The rotor concentrator housing confined space requirement is currently a Non-Permit Required Confined Space. Can this same status (Non-Permit Confined Space) for this confined space be used for this project? Answer - Refer to Section 1.2. Additional clarification is provided as follows: Confined space coordination with LEAD: a. The contractor shall provide employees trained and certified in Confined Space Entry for all confined entry work. b. The contractor shall provide all necessary equipment to perform confined space entry. c. The contractor shall supply a person trained as a confined space entry supervisor for each confined space entry. Such supervisor shall be present at the site for each confined space entry. d. Such supervisor shall prepare the confined entry permit. Such supervisor is responsible for keeping (on the site) proof of confined space entry training for workers performing confined space; as well as proof of their confined worker/supervisor training. Such proof shall be provided to LEAD Safety/Fire Department employees on demand; to obtain confined entry approval. e. Such approval shall be maintained on site during the confined space entry. f. The confined entry supervisor shall provide the LEAD Fire Department verbal notification when confined entry is to begin (at least 15 minutes advance notification). g. The confined entry supervisor shall provide the LEAD Fire Department verbal notification when confined entry is completed. h. The contractor shall provide completed copies of confined entry logs to LEAD and the COR daily. i. The contractor shall strictly follow quote mark Chapter 20. Confined Space Program quote mark of the guidance document quote mark LEAD-R 385-1. quote mark Electrical tag out and lock out procedures: a. The contractor shall lock out or tag all equipment to be worked on. The contractor personnel shall not attempt to operate any switch, valve, or other energy-isolating device that is locked or tagged out. b. The contractor shall coordinate with the LEAD Building POC on all lockouts/tagouts. Each lockouts/tagout device shall have the following information attached to it: Date & time Contractor Name, POC, and phone number Location of equipment that is tagged out. c. The contractor shall provide the LEAD Building POC with the following information before work begins: estimated start time of lockout/tagout estimated duration of lockout/tagout d. The contractor shall only begin lockout/tagout after obtaining the approval of the LEAD Building POC. e. In the event that the lockout/tagout takes longer than estimated, The contractor shall immediately notify the LEAD Building POC. f. At the end of a lockout/tagout The contractor shall obtain the permission of the LEAD Building POC before re-energizing any and all locked out or tagged out equipment. g. The contractor shall strictly follow quote mark Chapter 12 Lockout/Tagout Program quote mark of the guidance document quote mark LEAD-R 385-1 quote mark (which is attached with this document). h. The contractor shall provide completed copies of confined entry logs to LEAD and the COR daily. i. The Contractor shall strictly follow quote mark Chapter 20, Confined Space program quote mark of the guidance document quote mark LEAD-R 385-1. quote mark See the attachment for the remainder of this answer.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/81b20fb73a73d93c042e492fb488696e)
- Record
- SN03161225-W 20130825/130824000401-81b20fb73a73d93c042e492fb488696e (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)