Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 07, 2013 FBO #4274
MODIFICATION

Y -- Road 2510 Storage and Rock Development Project - Bid Bond - Copy to Submit - Solicitation 1

Notice Date
8/5/2013
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Northwest Contracting Area, Mt. Baker-Snoqualmie NF, 2930 Wetmore Avenue Ste 3A, Everett, Washington, 98201, United States
 
ZIP Code
98201
 
Solicitation Number
AG-05M6-S-13-0030
 
Response Due
8/21/2013 3:00:00 PM
 
Point of Contact
Jorge A. Somoza, Phone: (425) 783-6053, Jim Mitchell, Phone: 360-854-2620
 
E-Mail Address
jsomoza@fs.fed.us, jbmitchell@fs.fed.us
(jsomoza@fs.fed.us, jbmitchell@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Solicitation Copy to Submit Bind Bond PROJECT DESCRIPTION Road 2510 Storage and Rock Development Project - FSR 2510 MP 2.90 - 4.341 Storage - FSR 2510 at MP 2.9 Rock Development - This project includes, but is not limited to, removal of all culverts and the construction of drainage features for the purposes of placing the road into storage. In addition Rock will need to be developed, sorted, and separated at the MP 2.9 pit for use on this project. The Contractor shall furnish all labor, materials, equipment, tools, transportation and supplies, and perform all work required according to the drawings and specifications of the contract. The Contractor shall assume all risk, loss, damage, or expense arising out of prosecution of the work, except as otherwise provided in the contract. PROJECT LOCATION From Darrington, WA, proceed Northerly on State Route 530 approximately 7.5 miles to the junction of Forest Road 26, Suiattle, on the right. Proceed Easterly on Road 26 for 10 miles to the junction of Forest Road 25 on the right. Proceed Southerly on Road 25 for 0.9 miles to the junction of Forest Road 2510 MP 0.0 on the right. Proceed on Road 2510 for 2.94 miles to the project location for Road 2510 storage project. Township 32 N, Range 11 E, Section 17. A District map showing the road system is available for viewing at the district office. PLANS/SPECIFICATIONS/DRAWINGS Maps and drawings for this project are attached for information only. The final maps and drawings will be issued with the formal solicitation. PERIOD OF PERFORMANCE 60 Calendar Days DESIRED START DATE September 2013 PRE-BID MEETING A pre-bid meeting will not be held and project bidders are advised to visit the project site prior to bidding in order to be familiar with the project's road system and the access to each road work area. DISCLOSURE OF THE MAGNITUDE OF THE CONSTRUCTION PROJECT (FAR 36.204) Between $100,000 and $250,000. BONDING REQUIREMENTS Bid Guarantee, Performance Bond, and Payment Bond will be required as detailed in the formal solicitation. POINTS OF CONTACT Business: Jorge Somoza, (425) 783-6053, jsomoza@fs.fed.us Technical: Jim Mitchell, (360) 854-2620, jbmitchell@fs.fed.us
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/05M6/AG-05M6-S-13-0030/listing.html)
 
Place of Performance
Address: Mt. Baker Snoqualmie National Forest, 2930 Wetmore Ave., Suite 3A, Everett, Washington, 98201, United States
Zip Code: 98201
 
Record
SN03137168-W 20130807/130805234419-0c64fb11bfaa5ebdeed70f9bedb04e16 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.