MODIFICATION
F -- Ashley Herrig BMP's and Culvert Replacmeents
- Notice Date
- 7/24/2013
- Notice Type
- Modification/Amendment
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-1 Western Montana Acquisition Zone (Lolo NF; Flathead NF; Bitterroot NF; Regional Office; Aerial Fire Depot), Building 24, Fort Missoula, Missoula, Montana, 59804
- ZIP Code
- 59804
- Solicitation Number
- AG-03R6-S-13-0073
- Archive Date
- 8/30/2013
- Point of Contact
- Ron Penrose, Phone: 406-329-3979, Barbara E Venturini, Phone: 406-758-5318
- E-Mail Address
-
rpenrose@fs.fed.us, bventurini@fs.fed.us
(rpenrose@fs.fed.us, bventurini@fs.fed.us)
- Small Business Set-Aside
- Total Small Business
- Description
- The Western Montana Acquisition Zone anticipates awarding a contract for road BMP'snd culvert replacments on the Flathead national Forest, which includes 32 miles of reconstruction. The BMP work involves blading and shaping the roadway, consructing drain dips, and replacing and/or installing new ditch relief culverts. There are also four stream aligned culverts that are to be replaced with new pipe-arch culverts, one of which includes placing material inside the pipe to provide fish passage. The work is located on the Tally Lake Ranger District of the Falthead National Forest. The precise details of performing work are not stipulated except as considered essential for the conpletion of work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according tot he contract. The Government estimates the value of the work to be between $25,000 and $150,000. A site visit is scheduled for August 1, 2013 at 10:00m. The tour will begin at the Tally Lake Ranger Station, 650 Wolfpack Way, Kalispell, MT and then will travel to the project site. Interested parties may contact Kelly Siers at 406-758-5347 for information. The contract time to complete this project will be 45 days.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/03R6/AG-03R6-S-13-0073/listing.html)
- Place of Performance
- Address: Project Location (include directions):, The Ashley drainage can be reached from Kalispell, Montana, by traveling 15.5 miles west on Highway 2 from the intersection of Highway 93 and Highway 2 West to South Ashley Lake Road. Turn right on South Ashley Lake Road #679 and travel 7.7 miles and turn left on, Road #912. On Road #912, travel 0.8 miles to NFS, Road #10234., To reach the Herrig drainage, continue west 4.7 miles on Highway 2 from the intersection of South Ashley Lake Road #679 to the Pleasant Valley Road #543. Turn right on Road #543 and travel north 5.8 miles to the Griffin Creek Road NFS #538. Turn right on NFS #538 and travel 1.3 miles to NFS #5347., Kalispell, Montana, 59901, United States
- Zip Code: 59901
- Zip Code: 59901
- Record
- SN03126460-W 20130726/130724235957-e35e97b4768b51dafe1d08295b054b84 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |