AWARD
Y -- Design-Build Contract for Construction of Facilities for Afghan National Army (ANA), Project 12-C015, Kabul Military Training Center (KMTC) PH IV, Kabul, Afghanistan
- Notice Date
- 7/23/2013
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- USACE District, Louisville, 600 Dr. Martin Luther King, Jr. Place, Room 821, Louisville, KY 40202-2230
- ZIP Code
- 40202-2230
- Solicitation Number
- W5J9JE-13-R-0020
- Response Due
- 1/2/2013
- Archive Date
- 8/22/2013
- Point of Contact
- Tom Dickert, (502) 315-6177
- E-Mail Address
-
USACE District, Louisville
(tom.e.dickert@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W5J9JE-13-C-0034
- Award Date
- 7/18/2013
- Awardee
- MEGATECH (850487016) <br> Karte 4 <br> Kabul, 24000
- Award Amount
- $19,989,980.00
- Line Number
- 0001-0007
- Description
- This project consists of the preparation of design documents and the subsequent construction of the facilities. The project includes but not be limited to the design, material, labor, and equipment to construct buildings, parking areas, paving, ECP, utility tie in, and other infrastructures. Renovation of cantonment area barracks, troop medical center, and DPW is included. New construction includes cantonment area office buildings, classroom buildings, DPWs, heavy equipment workshop, POL storage, MWR building, warehouses, and guard shacks. Motor pool buildings and facilities include MP administration building, multi-purpose building, vehicle maintenance buildings, POL Storage, warehouses, motor pool, guard towers, guard shacks, wash rack, fuel point, and MP warehouse. Training FOB Buildings and Facilities include latrines, leach field, and septic tank. The project will contain options. The facility shall include structures as shown on the drawings, specifications, and contain all necessary utilities for operations as such. These facilities shall be designed and constructed in accordance with current building codes, safety, and security standards and applicable to local standards. Preparation of a site grading and drainage plan and obtain approval is required prior to construction. All utilities shall be complete and operational prior to occupancy. It is the contractor's responsibility to ensure that the designs are complete and are in compliance with the latest applicable building codes and regulations. This project will consist of materials, labor, and construction of various infrastructure and facilities and other features as referenced within the Statement of Work (SOW), using expeditious construction methods, to complete the project within a 540 (five-hundred-forty) day period.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA27/W5J9JE-13-R-0020/listing.html)
- Record
- SN03124364-W 20130725/130723235229-6f79d1211d19488067ce52d73bc44fa4 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |