SOLICITATION NOTICE
Y -- Road 2510 Storage and Rock Development Project - Project Maps & Drawings
- Notice Date
- 7/22/2013
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-6 Northwest Contracting Area, Mt. Baker-Snoqualmie NF, 2930 Wetmore Avenue Ste 3A, Everett, Washington, 98201, United States
- ZIP Code
- 98201
- Solicitation Number
- AG-05M6-S-13-0030
- Point of Contact
- Brian A. Johnson, Phone: (425) 783-6056, Jim Mitchell, Phone: 360-854-2620
- E-Mail Address
-
bajohnson03@fs.fed.us, jbmitchell@fs.fed.us
(bajohnson03@fs.fed.us, jbmitchell@fs.fed.us)
- Small Business Set-Aside
- Total Small Business
- Description
- Project Maps & Drawings (Information Only) PROJECT DESCRIPTION Road 2510 Storage and Rock Development Project - FSR 2510 MP 2.90 - 4.341 Storage - FSR 2510 at MP 2.9 Rock Development - This project includes, but is not limited to, removal of all culverts and the construction of drainage features for the purposes of placing the road into storage. In addition Rock will need to be developed, sorted, and separated at the MP 2.9 pit for use on this project. The Contractor shall furnish all labor, materials, equipment, tools, transportation and supplies, and perform all work required according to the drawings and specifications of the contract. The Contractor shall assume all risk, loss, damage, or expense arising out of prosecution of the work, except as otherwise provided in the contract. PROJECT LOCATION From Darrington, WA, proceed Northerly on State Route 530 approximately 7.5 miles to the junction of Forest Road 26, Suiattle, on the right. Proceed Easterly on Road 26 for 10 miles to the junction of Forest Road 25 on the right. Proceed Southerly on Road 25 for 0.9 miles to the junction of Forest Road 2510 MP 0.0 on the right. Proceed on Road 2510 for 2.94 miles to the project location for Road 2510 storage project. Township 32 N, Range 11 E, Section 17. A District map showing the road system is available for viewing at the district office. PLANS/SPECIFICATIONS/DRAWINGS Maps and drawings for this project are attached for information only. The final maps and drawings will be issued with the formal solicitation. PERIOD OF PERFORMANCE 60 Calendar Days DESIRED START DATE September 2013 PRE-BID MEETING A pre-bid meeting will not be held and project bidders are advised to visit the project site prior to bidding in order to be familiar with the project's road system and the access to each road work area. DISCLOSURE OF THE MAGNITUDE OF THE CONSTRUCTION PROJECT (FAR 36.204) Between $100,000 and $250,000. BONDING REQUIREMENTS Bid Guarantee, Performance Bond, and Payment Bond will be required as detailed in thehe formal solicitation when issued. DATE SOLICITATION WILL BE ISSUED On or around 15 calendar days from the date of the FBO presolicitation notice issuance. POINTS OF CONTACT Business: Brian Johnson, (425) 783-6056, bajohnson03@fs.fed.us Technical: Jim Mitchell, (360) 854-2620, jbmitchell@fs.fed.us
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/05M6/AG-05M6-S-13-0030/listing.html)
- Place of Performance
- Address: Mt. Baker Snoqualmie National Forest, 2930 Wetmore Ave., Suite 3A, Everett, Washington, 98201, United States
- Zip Code: 98201
- Zip Code: 98201
- Record
- SN03123295-W 20130724/130722234833-77f2f089a20def857224ae2b053b5581 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |